Related Experiment Video
Updated: Sep 6, 2025

Production of Arbuscular Mycorrhizal (AM) Fungal Inoculum and Phenotypic Evaluation of Rice and AM Symbiosis Under Saline Conditions
Published on: March 14, 2025
Autophagy and Programmed Cell Death Are Critical Pathways in Jasmonic Acid Mediated Saline Stress Tolerance in Oryza
Mohd Shahanbaj Khan1, S Hemalatha2
1School of Life Sciences, B. S. Abdur Rahman Crescent Institute of Science and Technology, Chennai, TN, India.
Abstract:
Saline stress is the most limiting condition impacting the plant growth, development, and productivity. In this present study, jasmonic acid (JA) was used as a foliar spray on the rice seedlings grown under saline stress. Increase in photosynthetic pigments, anthocyanin, and total protein content was observed with JA treatment while NaCl showed reduction in biochemical constituents and enhanced antioxidant enzyme activity. The leaf cells of NaCl-treated seedlings accumulated more ROS and had more fragmented nuclei, whereas JA decreased the accumulation and fragmentation during saline stress. In NaCl treatment, gene expression analysis showed many fold upregulation in comparison with other treatments. The results suggest that JA acts as a promoter for growth, physiological, biochemical, and cellular contents, as well as ameliorate the effects of saline stress. The expression of genes demonstrated that saline stress may promote autophagy, which leads to autophagic cell death, and improve tolerance to saline stress in rice seedlings via the jasmonic acid signaling pathway. However, the mechanism by which jasmonate signaling induces autophagy and cell death is unknown and requires further exploration.
More Related Videos
08:27Analysis of Effect of Compound Salt Stress on Seed Germination and Salt Tolerance Analysis of Pepper Capsicum annuum L.
Published on: November 30, 2022
11:27A Flexible Low Cost Hydroponic System for Assessing Plant Responses to Small Molecules in Sterile Conditions
Published on: August 25, 2018
Related Concept Videos
Responses to Salt Stress
Responses to Drought and Flooding
Adaptations that Reduce Water Loss
Autophagic Cell Death
Autophagy and Apoptosis
Autophagy can activate apoptosis. In normal conditions, the autophagy activating protein Beclin-1 and...
Responses to Heat and Cold Stress
Regulation of Transpiration by Stomata