Study on the damage characteristics of overburden of mining roof in deeply buried coal seam
Tianwen Long1,2, Enke Hou3,4, Xiaoshen Xie3,4
1College of Geology and Environment, Xi'an University of Science and Technology, Xi'an, 710054, China. ltw@stu.xust.edu.cn.
Abstract:
The study of water-conducting fracture zone development height is key to the scientific prevention and control of water damage in mines. Based on the geological conditions of the Wenjiapo coal mine in Binchang, China, this paper investigates the development of water-conducting fracture zone in overlying bedrock during mining under large buried depth and huge thick aquifer by combining on-site well-location microseismic monitoring and laboratory similar material simulation. To overcome the limitation of the " limited outlook " of water-conducting fracture zone investigation, the spatial development characteristics of roof fissures in coal seam mining were determined by on-site " the underground - ground" combined microseismic monitoring and follow-up monitoring, and the development of overlying rock fracture under the large depth of burial was concluded. The fractures were mainly distributed in the upper part of the protective coal pillar on both sides of the working face, but less in the upper part of the working face, and primarily distributed in the protective coal pillar on the side of the working face and the adjacent mining area. To verify the accuracy of the conclusion, the overlying bedrock movement and deformation characteristics and the development process of the hydraulic fracture zone during coal seam mining were analyzed by simulating similar materials in the laboratory, using the monitored area as a prototype. The results show that the development height of the mining fracture zone obtained from microseismic monitoring is basically consistent with the simulation results of similar materials. The research finding have significant implications for the study of fracture distribution characteristics and the evolution law of mining overburden, and provide a foundation for scientific prevention and control of water damage on the roof.
Related Concept Videos
Masonry Cavity Walls
Maintaining a clean cavity during construction...
Cavity Drainage and Flashings in Masonry walls
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Taping Over Different Ground Profiles
Mortar Joint Deterioration in Masonry
The...
Survival Tree
Building a Survival Tree
Constructing a...