Related Experiment Video
Updated: Sep 5, 2025

10:57
Elaborate Control of Inkjet Printer for Fabrication of Chip-based Supercapacitors
Published on: November 30, 2021
2.9K
Development of a Multi-Layer Marking Toolkit for Layout-Printing Automation at Construction Sites
Eun Soo Park1, Hee Chang Seo2, An Yong Lee3
1Department of Architecture, Sahmyook University, Seoul 01795, Korea.
Sensors (Basel, Switzerland)
|July 9, 2022
Summary
This study developed an automated multi-layer marking toolkit to enhance construction site layout-printing accuracy. The modular system reduces human error, improving overall construction quality and design consistency.
Area of Science:
- Construction Engineering
- Automation and Robotics
- Geomatics Engineering
Background:
- Conventional construction layout-printing relies heavily on manual labor, leading to inconsistencies and errors.
- Human error in manual layout-printing can compromise overall construction quality and design integrity.
- Existing methods lack standardization, making quality control challenging and site-specific.
Purpose of the Study:
- To develop an automated multi-layer marking toolkit for construction sites.
- To address inconsistencies and improve the quality of layout-printing work.
- To mitigate design irregularities caused by human error in construction processes.
Main Methods:
- Designed a modular, multi-layer marking toolkit apparatus and mechanical unit for automated implementation.
- Developed independent, manually operable modules to gather system movement data.
- Integrated the system via Ethernet for data transfer and utilized a wireless joystick for control.
- Conducted feasibility experiments on road surfaces with B4 paper and concrete panels.
Main Results:
- Successfully developed a modular, multi-layer marking toolkit system.
- Demonstrated manual operational feasibility through experiments on diverse surfaces.
- Acquired movement data from manually operated modules for system refinement.
- Established Ethernet connectivity for data transfer and wireless control.
Conclusions:
- The developed multi-layer marking toolkit shows promise for automated construction layout-printing.
- The modular and manual operation modes facilitate system improvement and data acquisition.
- The system's feasibility was confirmed, paving the way for enhanced construction accuracy.
Related Concept Videos
Design Example: Marking Boundaries of a Site Using a Compass
85
Marking site boundaries using a compass is a precise surveying technique that ensures the accuracy of boundary delineation. The process begins by using provided site details, including the bearings and lengths of each boundary line. The initial step involves calculating latitudes and departures for all sides of the site. This computation verifies that the traverse is free of errors, ensuring a closed and accurate boundary.The process starts at a known point, such as Point A, which is often...
85
Taping Over Different Ground Profiles
81
Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
81

