The Q-junction and the inflammatory response are critical pathological and therapeutic factors in CoQ deficiency

Pilar González-García1, María Elena Díaz-Casado1, Agustín Hidalgo-Gutiérrez1

  • 1Departamento de Fisiología, Facultad de Medicina, Universidad de Granada, 18016, Granada, Spain; Instituto de Biotecnología, Centro de Investigación Biomédica, Universidad de Granada, 18016, Granada, Spain.

Redox Biology
|July 21, 2022
PubMed

Related Concept Videos

Inflammatory Response01:28

Inflammatory Response

An inflammatory response is a localized, nonspecific immune reaction that occurs when a tissue is injured. It is characterized by redness, swelling, heat, and pain, which are commonly called the cardinal signs and symptoms of inflammation. Inflammation can sometimes result in a loss of function.
Inflammation can be triggered by various stimuli, such as impact, abrasion, chemical irritation, infections, and extreme hot or cold temperatures. These can damage cells and connective tissue fibers,...
6.0K
Inflammatory Response II: Inflammatory Exudate and Tissue Repair01:24

Inflammatory Response II: Inflammatory Exudate and Tissue Repair

The immune system's inflammatory response destroys the invading pathogen, permitting the tissue to heal. The changes during the cellular and vascular stages allow exudate formation at the site of inflammation. The inflammatory exudate released from the wound has high protein content and a specific gravity above 1.020.
The typical wound exudate is odorless, transparent, straw-colored, thin, and watery. Exudate, however, can differ depending on the state of wound healing. Likewise, the...
5.5K
Inflammatory Response I: Vascular and Cellular01:30

Inflammatory Response I: Vascular and Cellular

The inflammatory response is the body's defense against infection, injury, or irritation from bacteria, trauma, toxins, or heat. Inflammation helps locate and destroy pathogens and remove damaged tissue elements to heal the body. During this initial phase, fluid, blood products, and nutrients migrate to the injured area, resulting in redness, heat, swelling, ache, and loss of function. Moreover, signs of systemic inflammation include fever, increased WBC count, malaise, anorexia, nausea,...
12.2K
Gastritis-II: Pathophysiology01:17

Gastritis-II: Pathophysiology

Gastritis is marked by disruption of the mucosal barrier that usually protects the stomach tissue from digestive juices and manifests in acute and chronic forms.
In acute gastritis, the gastric mucosa becomes swollen and red and undergoes superficial erosion. Superficial ulceration may lead to bleeding.
In chronic gastritis, persistent or repeated insults lead to chronic inflammatory changes and, eventually, thinning or atrophy of the gastric tissue.
Gastritis can stem from various causes, each...
512
Inflammatory Bowel Disease II: Crohn's Disease01:30

Inflammatory Bowel Disease II: Crohn's Disease

Introduction
Inflammatory bowel disease, commonly known as IBD, refers to a collection of disorders that lead to persistent inflammation of the gastrointestinal tract. The two types of IBD are ulcerative colitis, which impacts the colon, and Crohn's disease, which can involve any part of the gastrointestinal segment.
Crohn's disease
Crohn's disease is a chronic, systemic inflammatory bowel disease (IBD) that predominantly affects the gastrointestinal tract. It is marked by...
367
Inflammatory Bowel Disease I: Ulcerative Colitis01:27

Inflammatory Bowel Disease I: Ulcerative Colitis

Introduction
Inflammatory bowel disease, or IBD, encompasses a group of disorders characterized by chronic inflammation or ulceration of the gastrointestinal tract.
Risk Factors
The exact cause of IBD remains unclear, although it is believed to be due to a mix of genetic, environmental, microbial, and immune factors. Genetic factors are significant in determining susceptibility to IBD, with family history being a critical risk factor. Individuals with a first-degree relative who has IBD are at...
302