Related Experiment Video
Updated: Sep 2, 2025

Ecotoxicological Methodologies to Evaluate Biomarkers at Different Scales in Neotropical Anurans
Published on: April 28, 2023
Criteria for Preliminary Risk Assessment of Brownfield Site: An International Survey of Experts
Charf Mahammedi1, Lamine Mahdjoubi2, Colin Booth2
1Brownfield Research and Innovation Centre (BRIC), University of Wolverhampton, Wolverhampton, WV10 0JP, UK. c.mahammedi@wlv.ac.uk.
Abstract:
Comprehensive risk assessment of brownfield sites requires a broad range of knowledge and multi-disciplinary expertise. Whilst the identification of criteria requirements for preliminary risk assessment has received some attention, there appears to be no studies that have specifically examined professional perspectives relating to these requirements. Yet, variations in professional practitioners' assessments may have significant consequences for the assessment of risks, and how the criteria are imparted to stakeholders. This study aims to identify the criteria requirements for preliminary risk assessment, using the pollutant linkage model (Source-Pathway-Receptor), and explores cross-disciplinary professional perspectives related to these requirements. To this end, this study commenced with a systematic review to identify various criteria streams required for the preliminary risk assessment of brownfield sites. Thereafter, a questionnaire survey was design and shared with brownfield site professionals. Quantitative analysis of the survey responses (n = 76) reveals disciplines have markedly different priorities relating to the same hazard. For instance, geophysicists, geochemists, and hydrologists do not raise concerns regarding ground movement that can result from the removal of storage and tanks, whilst the same hazard was considered as having a high importance by other professions (such as geologists and geotechnical engineers). This example, amongst others revealed in the study, underpins potential issues and implications for various stakeholders compiling and/or using preliminary risk assessment criteria. This study clarifies both the key criteria requirements for the preliminary risk assessment of brownfield sites, as well as the importance of recognising how variation in professionals' perceptions plays in the risk assessment process. Although, specialist knowledge is essential for brownfield site investigation, so is the maintaining a broad-based view of other experts coming from different backgrounds, as this renders holistic risk assessment insights.
More Related Videos
09:39Physical, Chemical and Biological Characterization of Six Biochars Produced for the Remediation of Contaminated Sites
Published on: November 28, 2014
13:00Modifying the Bank Erosion Hazard Index BEHI Protocol for Rapid Assessment of Streambank Erosion in Northeastern Ohio
Published on: February 13, 2015
Related Concept Videos
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Types of Biopharmaceutical Studies: Controlled and Non-Controlled Approaches
Non-controlled studies, commonly employed for initial exploration, lack a control group, rendering them susceptible to biases and external influences. In contrast,...
Survey Safety