Saving light, losing lives: How daylight saving time impacts deaths from suicide and substance abuse
Related Experiment Video
Updated: Aug 31, 2025

Author Spotlight: Unveiling the Connection Between Sleep Disorders and Cognitive Symptoms in Depression
Published on: April 26, 2024
Eric Jonathon Osborne-Christenson1
1Department of Economics, Pace University, New York, New York, USA.
Abstract:
This paper estimates the impact of Daylight Saving Time (DST) on deaths from suicide and substance abuse in the United States. Using Multiple Cause-of-Death Mortality Data from the National Vital Statistics System of the National Center for Health Statistics from 1979 to 1988, the effect is identified in two ways: a regression discontinuity design that exploits discrete time changes in the Spring and Fall; and a fixed effects model that uses a policy change and a switching mechanism that introduces random variation to DST's start and end dates. This is one of the first attempts to estimate the impact of DST on deaths due to suicide and substance abuse and the first to use either identification strategy. The results from both methods suggest that the sleep disruptions during the Spring transition cause the suicide rate to rise by 6.25 percent and the death rate from suicide and substance abuse combined to increase by 6.59 percent directly after the time change. There is no evidence for any change in these outcomes during the Fall transition. The contrasting results from Spring to Fall suggest the entire effect can be attributed to disruptions in sleep patterns rather than changes in ambient light exposure.
Related Concept Videos
Substance Use Disorders Affecting Sleep
Understanding the concepts of physical dependence,...
Stress and Mental Health
Individuals with depression often experience challenges in both their personal and professional...
Insufficient Sleep and Sleep Deprivation
Sleep deprivation is a more severe form of sleep loss...
Chronopharmacokinetics: Circadian Rhythms and Influence on Drug Response
The time of drug administration is an important factor to consider, as it can influence the toxic dose of a drug. For example, a study conducted by Prins et al. in 1997 examined the effects of the timing of...
Long-term Depression
Calcium Ion Concentration Mechanism
If over...
Stress Prevention and Stress Management Techniques IV

