Related Experiment Video
Updated: Aug 30, 2025

Mechanical Expansion of Steel Tubing as a Solution to Leaky Wellbores
Published on: November 20, 2014
An Analytical Solution for Stress Transfer between a Broken Prestressing Wire and Mortar Coating in PCCP
Xiaojie Zhang1,2, Jiayu Wu2,3, Chao Hou2,3
1School of Astronautics, Harbin Institute of Technology, Harbin 150001, China.
Abstract:
A prestressed concrete cylinder pipe (PCCP) consists of a concrete core, a steel cylinder, prestressing wires, and a mortar coating. Most PCCP failures are related to the breakage of prestressing wires. It is thus expected that the load-bearing capacity of PCCP is significantly affected by the length of the prestress loss zone and the stress distribution in the broken wire. Based on a tri-linear bond-slip model, the length of prestress loss zone and the stress transfer mechanism between a broken wire and a mortar coating are analysed in this paper. During the breaking (unloading) process of a prestressing wire, the interfacial bondline exhibits the following three stages: elastic stage, elastic-softening stage, and elastic-softening-debonding stage. The closed-form solutions for the interfacial slip, the interfacial shear stress, and the axial stress in the broken wire are derived for each stage. The solutions are verified by the finite element predictions. A parametric study is presented to investigate the effects of the size of the prestressing wires, the prestressing level, the interfacial shear strength, and the residual interfacial shear strength on the interfacial stress transfer. For an example PCCP with an inner diameter of 4 m, the length of prestress loss zone increases from 500 mm to 3300 mm as the radius of prestressing wire increases from 1 mm to 7 mm. It increases from 2700 mm to 7700 mm when the interfacial shear strength reduces from 3.94 MPa to 0.62 MPa and reduces from 13,200 mm to 7300 mm as the residual interfacial shear stress factor increases from 0.1 to 0.9.
More Related Videos
11:07Preparation of Aligned Steel Fiber Reinforced Cementitious Composite and Its Flexural Behavior
Published on: June 27, 2018
10:00Experimental Protocol to Determine the Chloride Threshold Value for Corrosion in Samples Taken from Reinforced Concrete Structures
Published on: August 31, 2017
Related Concept Videos
Bending of Material: Problem Solving
Stress Concentrations
Stresses under Combined Loadings
The process begins by slicing the tube at critical points and analyzing the internal forces and stress components at these sections, focusing on the centroid. Normal stresses, generated by axial forces and bending moments, are either compressive or tensile and vary across the section from...
Stress Concentrations in Circular Shafts
Applications of Stress
The...
Prestressed Concrete