Systems biology approach delineates critical pathways associated with disease progression in rheumatoid arthritis

Sai Krishna Srimadh Bhagavatham1, Sujith Kumar Pulukool1, Sai Sanwid Pradhan1

  • 1Disease Biology Lab, Department of Biosciences, Sri Sathya Sai Institute of Higher Learning, Anantapur, A.P., India.

Related Concept Videos

The JAK-STAT Signaling Pathway01:20

The JAK-STAT Signaling Pathway

Several cytokine receptors have tightly bound Janus kinase or JAK proteins attached at their cytosolic tail. Small signaling molecules such as cytokines, growth hormones, or prolactins bind to the cytokine receptors and initiate their dimerization. The dimerization brings the cytosolic JAKs together that trans-phosphorylate and activates each other. The activated JAKs now phosphorylate cytosolic tails of the cytokine receptors, which serve as binding sites for adaptor proteins such as  SH2...
9.2K
T Cell Types and Functions01:24

T Cell Types and Functions

When T cells with CD4 markers are activated, they give rise to two types of effector cells: helper T cells and regulatory T cells. Meanwhile, T cells with CD8 markers differentiate into effector cytotoxic T cells. The differentiation of CD4 T cells into helper T cell subsets, such as Th1, Th2, and Th17 cells, is dependent on the antigen type, antigen-presenting cell, and regulatory cytokines.
Th1 cells stimulate dendritic cells to express necessary co-stimulatory molecules on their surfaces for...
1.3K
Genome-wide Association Studies-GWAS01:11

Genome-wide Association Studies-GWAS

Genome-wide association studies or GWAS are used to identify whether common SNPs are associated with certain diseases. Suppose specific SNPs are more frequently observed in individuals with a particular disease than those without the disease. In that case, those SNPs are said to be associated with the disease. Chi-square analysis is performed to check the probability of the allele likely to be associated with the disease.
GWAS does not require the identification of the target gene involved in...
14.0K
Interactions Between Signaling Pathways01:19

Interactions Between Signaling Pathways

Signaling cascades usually lack linearity. Multiple pathways interact and regulate one another, allowing cells to integrate and respond to diverse environmental stimuli.
Convergence and divergence, and cross-talk between signaling pathways
Two distinct signaling pathways can converge on a single functional unit, which may either be a single protein or a complex of proteins. The response is either functionally distinct or synergistic between the two pathways but different from the response...
6.4K
NF-κB-dependent Signaling Pathway02:26

NF-κB-dependent Signaling Pathway

The transcription factor NF-κB was discovered in 1986 in the lab of Nobel laureate Professor David Baltimore, for its interaction with the immunoglobulin light chain enhancer in B-cells. After more than three decades of study, it is now evident that NF-κB regulates the expression of over 100 genes. Most of these genes play an essential role in the innate and adaptive immune responses as well as the inflammatory responses of animals.
NF-κB-dependent Signaling Mechanism
The...
7.8K
Rheumatic Heart Disease I: Introduction01:23

Rheumatic Heart Disease I: Introduction

Rheumatic heart disease or RHD is a chronic condition that results from rheumatic fever, causing permanent damage to the heart valves.Etiology and Risk FactorsIt primarily arises from rheumatic fever, an inflammatory disease that can develop after untreated or inadequately treated group A streptococcal (GAS) pharyngitis. Streptococcus spreads through direct contact with oral or respiratory secretions. While the bacteria are the causative agents, factors like malnutrition, overcrowding, poor...
33