Modeling and solving the parallel mixed-flow remanufacturing disassembly line balancing problem for multi-variety
Gang Yu1, Xiufen Zhang2, Wei Meng3
1Inner Mongolia Technical College of Mechanics and Electrics, Hohhot, 010070, People's Republic of China.
This study introduces a new method for optimizing remanufacturing disassembly lines for varied products, improving efficiency by using a parallel mixed-flow workstation layout and a novel optimization model. The approach enhances the balancing of disassembly lines, leading to better resource utilization and value recovery.
Area of Science:
- * Engineering
- * Operations Research
- * Sustainable Manufacturing
Background:
- * Traditional remanufacturing disassembly lines face challenges with component uncertainty in end-of-life (EOL) products, resulting in low efficiency.
- * The variability in component types and quantities hinders effective disassembly processes.
Purpose of the Study:
- * To propose a novel optimization method for parallel mixed remanufacturing disassembly line balancing (PMRDLB) for multi-variety products.
- * To enhance disassembly efficiencies and component value recovery in remanufacturing.
Main Methods:
- * Development of a parallel mixed-flow workstation layout.
- * Construction of a mixed-flow product disassembly task hierarchical assignment matrix for task allocation.
- * Creation of a PMRDLB optimization model with objectives including minimizing workstations and maximizing balancing rate and remanufacturing value.
- * Improvement of the Non-dominated Sorting Genetic Algorithm III (NSGA-III) with a novel chromosome construction method and Pareto hierarchy-based sorting.
Main Results:
- * A case study demonstrated the effectiveness and feasibility of the proposed PMRDLB method.
- * The improved NSGA-III algorithm showed increased searching rates during optimization.
- * The method addresses the uncertainty of component types and numbers in EOL products.
Conclusions:
- * The proposed parallel mixed remanufacturing disassembly line balancing method effectively optimizes disassembly processes for multi-variety products.
- * The approach enhances efficiency and value recovery in remanufacturing operations.
- * The study provides a viable solution for improving the sustainability of product lifecycles.
Related Concept Videos
Laminar Flow: Problem Solving
Multimachine Stability
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
Distributed Loads: Problem Solving
Mechanistic Models: Compartment Models in Algorithms for Numerical Problem Solving
In individual population analyses, different algorithms are employed, such as Cauchy's method, which uses a...
Turbulent Flow: Problem Solving
Temperature is a key factor in CO2 solubility. In this case, the CO2 gas and the liquid are cooled to 20°C. Lower temperatures...
Typical Model Studies