Stature Prediction by Comparing Maxillary and Mandibular Intercanine Width and Intermolar Width among Tamil Nadu

J Dinakaran1, S Rathi Vadhana1, S Shamala Ravikumar1

  • 1Department of Oral and Maxillofacial Pathology and Microbiology, Adhiparasakthi Dental College and Hospital, Melmaruvathur, Tamil Nadu, India.

Abstract

Related Concept Videos

Teeth01:15

Teeth

The formation of teeth, also known as odontogenesis, is a complex process that begins in utero, around the sixth week of embryonic development. There are three stages to this process: the bud stage, the cap stage, and the bell stage.
In the bud stage, the tooth germ (an aggregation of cells) starts to form in the developing jawbone. During the cap stage, the tooth germ differentiates into enamel organ, dental papilla, and dental sac, which will later develop into the tooth's enamel, dentin...
594
Estimating Population Mean with Unknown Standard Deviation01:22

Estimating Population Mean with Unknown Standard Deviation

In practice, we rarely know the population standard deviation. In the past, when the sample size was large, this did not present a problem to statisticians. They used the sample standard deviation s as an estimate for σ and proceeded as before to calculate a confidence interval with close enough results. However, statisticians ran into problems when the sample size was small. A small sample size caused inaccuracies in the confidence interval.
William S. Gosset (1876–1937) of the...
8.3K
Estimating Population Mean with Known Standard Deviation01:16

Estimating Population Mean with Known Standard Deviation

To construct a confidence interval for a single unknown population mean μ, where the population standard deviation is known, we need sample mean as an estimate for μ and we need the margin of error. Here, the margin of error (EBM) is called the error bound for a population mean (abbreviated EBM). The sample mean is the point estimate of the unknown population mean μ.
The confidence interval estimate will have the form as follows:
(point estimate - error bound, point estimate +...
8.9K