Related Experiment Video
Updated: Aug 27, 2025

Mesocosm-Scale Constructed Wetland Design for Wastewater Treatment
Published on: May 2, 2025
Cost effectiveness of nutrient retention in constructed wetlands at a landscape level
F Djodjic1, P Geranmayeh1, D Collentine1
1The Department of Aquatic Sciences and Assessment, SLU, P.O. Box 7050, SE-75007, Uppsala, Sweden.
Abstract:
Since 1990, over 13 000 ha of constructed wetlands (CWs) have been implemented to increase biodiversity and reduce nitrogen (N) and phosphorus (P) loads to Swedish waters. Despite the considerable number of CWs and ambitious investments planned for the coming three years, there is limited follow up of cost-efficiency of catchment- and landscape-scale nutrient retention by existing CWs. Such follow up evaluation could provide clear guidance regarding optimal size and location of future CWs. We present a three-step modelling approach to assess cost-efficiency of 233 CWs in two Swedish regions (East, 4321 km2, and West, 916 km2). Modelled nutrient retention in CWs was predominantly low, especially in the East, due to their suboptimal location in catchments, e.g., with inadequate upstream areas (low hydraulic loads) and/or low share of arable land (low nutrient loads). Suboptimal location of CWs generates both higher than necessary costs and low area-specific nutrient retention, leading to low cost-efficiency. Some high cost-efficiency CWs were identified, especially for N retention in the West. To increase their cost-efficiency, continued investments in CWs require clear guidance and instructions. To achieve optimal placement, both CW site and size in relation to incoming hydraulic and nutrient loads must be considered.
More Related Videos
Related Concept Videos
Conservation of Mass in Moving, Nondeforming Control Volume
In the context of a detention basin, the conservation of mass states that the total mass of water entering the basin must equal the mass leaving the basin plus any accumulation of...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Maintaining Level of an Embankment

