Proposal for the Integration of the Assessment and Management of Electrical Risk from Overhead Power Lines in BIM for

Darío Collado-Mariscal1, Juan Pedro Cortés-Pérez1, Alfonso Cortés-Pérez2

  • 1Department of Construction, School of Technology, University of Extremadura, Avda. de la Universidad s/n, 10003 Cáceres, Spain.

Related Concept Videos

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
96
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
90
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
472
Insulation Coordination01:23

Insulation Coordination

Insulation coordination is the process of matching electric equipment's insulation strength with protective device characteristics to protect the equipment against expected overvoltages. This selection is based on engineering judgment and cost. Equipment can generally withstand short-duration high transient overvoltages, but repeated tests with identical waveforms can yield inconsistent results. As a result, standard impulse voltage waveforms are used for testing, defined by specific times...
209
Series Impedances: Three-Phase Line01:27

Series Impedances: Three-Phase Line

Calculating series impedances for a three-phase overhead line involves evaluating resistances and inductive reactances in a network with three-phase and multiple neutral conductors grounded at regular intervals.
Using Kirchhoff's laws, an integro-differential equation for the network is derived. This equation accounts for unbalanced phase currents, which may induce return currents through neutral wires and the earth, seeking the least impedance path. Earth return conductors can replace the...
142
Elevation of Intermediate Points on Vertical Curves01:20

Elevation of Intermediate Points on Vertical Curves

Vertical curves are essential in roadway design because they provide smooth transitions between varying roadway grades. Designing vertical curves involves calculating intermediate elevations and identifying the curve's highest or lowest point, which is essential for optimal roadway performance.Intermediate elevations on a vertical curve are determined using the tangent offset method. This method considers the initial elevation at the start of the curve, the grades, and the curve's geometry. The...
65