Mechanical Expansion of Steel Tubing as a Solution to Leaky Wellbores
Published on: November 20, 2014
Precise application of grouting technology in underground coal mining: water inrush risk of floor elimination
1State Key Laboratory of Geomechanics and Deep Underground Engineering, China University of Mining and Technology, Xuzhou, 221116, Jiangsu, China. minglzcumt@126.com.
Abstract:
Many coal mines in China suffer from the Ordovician limestone (OL) and Carboniferous limestone (CL) containing water inrush frequently due to the complex geology condition; water inrush has become a serious disaster in coal mining. To prevent water-bursting disaster from the floor of mine and cutting down deaths and economic loss, a grouting method for limestone fracture aquifer has been widely adopted. In this paper, a time-dependent empirical grouting model considering (1) time-dependent behavior of the injected slurry, (2) response of the rock, and (3) interaction between the slurry and rock was proposed to describe the slurry diffusion mechanism in rock fracture. Aiming at the problem of water disaster prevention of a coal seam floor in 16,104 working face of Luxi coal mine, that was, the grouting failed to seal the water flow channel of aquifer, the causes of the failure of grouting for water sealing were analyzed. According to the aquifer parameters and model calculation results, a grouting scheme with a slurry diffusion radius of 20 m and grouting pressure of 8 MPa was proposed; 2 rounds of grouting were implemented, following the split spacing principle, to ensure that finer fractures can be sufficiently sealed. Finally, with the comparative analysis through the network parallel electrical method (NPEM) and the drilling exploration method for water-rich areas before and after grouting, it was verified that the grouting effect for floor limestone aquifer was good, and the grouting scheme proposed and the grouting pressure designed were reasonable. Results may provide reference to a karst fractured aquifer grouting project, as well as reduced the losing because of blindness and experience.
More Related Videos
10:27A Uniaxial Compression Experiment with CO2-Bearing Coal Using a Visualized and Constant-Volume Gas-Solid Coupling Test System
Published on: June 12, 2019
12:18Pore-scale Imaging and Characterization of Hydrocarbon Reservoir Rock Wettability at Subsurface Conditions Using X-ray Microtomography
Published on: October 21, 2018
Related Concept Videos
Preplaced Aggregate Concrete
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Waterproofing and Anti-Bacterial Admixtures in Concrete
Waterproofing admixtures render concrete hydrophobic,...
Finishing Concrete
Design Example: Managing Concrete Workability
Cavity Drainage and Flashings in Masonry walls
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...