Related Experiment Video
Updated: Aug 22, 2025

An R-Based Landscape Validation of a Competing Risk Model
Published on: September 16, 2022
Forecasting Value at Risk and Expected Shortfall of Foreign Exchange Rate Volatility of Major African Currencies via
Emmanuel Afuecheta1,2, Idika E Okorie3, Saralees Nadarajah4
1Department of Mathematics and Statistics, King Fahd University of Petroleum and Minerals, Dhahran, Saudi Arabia.
Abstract:
Research on the exchange rate volatility and dynamic conditional correlation of African currencies/financial markets interdependence appears to be limited. In this paper, we employ GARCH models to characterize the exchange rate volatility of eight major African currencies. The variation of interdependence with respect to time is described using the DCC-GARCH model. From the results of the DCC, remarkable variations in correlations through time across these countries are observed with the correlations varying from low to moderate, suggesting that African economies are generally governed by certain economic factors and are vastly regulated. These regulations, including exchange rate misalignment led to sluggish and negative growth in most of the African countries. For instance, persistent misalignment can cause high levels of inflation, for example, undervaluation. Overvaluation can lead to trade imbalances and they can in turn create macroeconomic instability and balance of payment problems. Given these results, we suggest that policy makers should revamp and adopt state resilience so as to reduce the negative effect of exchange rate misalignment on economic growth.
Related Concept Videos
Econometric Views (EViews)
Regression Analysis
In regression analysis, a regression equation is determined based on the line of best fit– a line that best fits the data points plotted in a graph. This line is also called the regression line. The algebraic equation for the regression line is called the regression equation. It is represented as:
Correlation and Regression
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Correlation of Experimental Data
For example, a spherical particle moving through a viscous fluid experiences drag. Dimensional analysis shows that the drag force depends on the particle's diameter, velocity,...
Microsoft Excel: Regression Analysis
To perform regression...

