Related Experiment Video
Updated: Aug 22, 2025

Problem-Solving Before Instruction PS-I: A Protocol for Assessment and Intervention in Students with Different Abilities
Published on: September 11, 2021
Improving ICSI success rates following root cause analysis and use of system behaviour charts: the devil is in the
Emma Woodland1, Michael Carroll2
1Department of Life Sciences, Manchester Metropolitan University, Manchester, UK emma.woodland@stu.mmu.ac.uk.
Abstract:
A fertility clinic observed a reduction in its fresh intracytoplasmic sperm injection (ICSI) implantation rate key performance indicator (KPI) below benchmark threshold which was further monitored but did not improve. The clinic had been performing ICSI successfully for >16 years with good ICSI implantation rates meeting benchmark level. A root cause analysis (RCA) was conducted, including the input from an external observer, reviewing all systems and processes. A bundle of recommended changes was implemented as part of an improvement cycle with the aim to increase fresh ICSI implantation rates back to benchmark. Quality improvement (QI) methodology and tools were used including Statistical-Process-Control charts (BaseLine SAASoft). Measurements included standard clinical outcome data. KPIs were tracked following defined and controlled clinical and laboratory changes. Fresh ICSI implantation rates improved significantly (p=0.013, ChiSq). The improvement work was limited by its design of a plan-do-study-act (PDSA) cycle 'intervention bundle' as opposed to small PDSA cycles of single changes. Therefore, the improvement could not be attributed to any singular intervention within the bundle. It took longer than anticipated to see improvement due to the impact of the pandemic. The QI project highlighted the difficulty for clinics with low cycle volumes to sensitively monitor KPI's in a timely and responsive way. The need to accumulate sufficient data to be confident of any trends/concerns means small clinics could be less responsive to any problems or too reactive to false positives. It is important to disseminate the learning from this improvement work because there is currently no agreed standardised optimal protocol for ICSI, resulting in clinics using slightly different approaches, and there are limited published reports where embryology KPI's are tracked following defined and controlled laboratory/clinical changes. This project provides useful knowledge about ICSI improvement interventions and could be more effective within a larger clinic with higher cycle volumes.
More Related Videos
09:43A Fully Automated Rodent Conditioning Protocol for Sensorimotor Integration and Cognitive Control Experiments
Published on: April 15, 2014
06:05The Participant-Reported Implementation Update and Score PRIUS: A Novel Method for Capturing Implementation-Related Data Over Time
Published on: February 19, 2021
Related Concept Videos
Interpreting Run Charts
Introduction to Statistical Process Control
Run Charts
Methods of Documentation III: PIE
Methods of Documentation VI: Case Management Model
For example, a patient with a chronic...
The R Chart
R charts are pivotal for pinpointing shifts in process variability. Stability is indicated when all data points remain within the defined upper and lower...