The lifetime impact of stress on fear regulation and cortical function

Sydney Trask1, Michael T Kuczajda1, Nicole C Ferrara2

  • 1Department of Psychological Sciences, Purdue University, West Lafayette, IN, USA.

Neuropharmacology
|December 4, 2022
PubMed

Related Concept Videos

Psychological Responses to Stress01:20

Psychological Responses to Stress

Psychological responses to stress encompass the various cognitive and emotional reactions individuals experience when faced with challenging or threatening situations, such as a job loss. Prolonged exposure to stressors can disturb emotional balance, increasing negative emotions (e.g., anxiety and sadness) and diminishing positive emotions (e.g., joy and satisfaction). These persistent emotional shifts are associated with an increased risk of both physical illness and mental health issues, such...
86
Physiological Foundation of Stress01:24

Physiological Foundation of Stress

Stress triggers a coordinated physiological response involving the sympathetic nervous system (SNS) and the hypothalamic-pituitary-adrenal (HPA) axis. This dual activation ensures that the body is prepared for both immediate and prolonged stress management. The process begins with the perception of a stressor. This initial phase activates the SNS, leading to the rapid release of adrenaline (epinephrine) from the adrenal glands.
Role of the Sympathetic Nervous System
Adrenaline triggers the...
142
Hypothalamic-Pituitary Axis01:37

Hypothalamic-Pituitary Axis

The response to stress—be it physical or psychological, acute or chronic—involves activation of the Hypothalamic-Pituitary-Adrenal (HPA) axis. The HPA axis is part of the neuroendocrine system because it involves both neuronal and hormonal communication. Its function is to regulate homeostatic systems—metabolic, cardiovascular, and immune—providing the necessary means to respond to a stressor.
61.1K
Stress and Mental Health01:30

Stress and Mental Health

Chronic stress profoundly affects mental health, significantly influencing mood, behavior, and overall quality of life. Research closely links chronic stress with mental health conditions such as depression, anxiety, and substance use disorders. Ongoing exposure to stress can lead to physiological and psychological changes, initiating a cycle of emotional distress and maladaptive coping mechanisms.
Individuals with depression often experience challenges in both their personal and professional...
196
Introduction to Stress and Lifestyle01:27

Introduction to Stress and Lifestyle

Stress is a multifaceted response to events perceived as challenging or threatening, highlighting physical, emotional, cognitive, and behavioral reactions. Physically, stress can lead to fatigue, sleep disruptions, and various health issues such as frequent colds, chest pains, and nausea. Emotionally, it can manifest as anxiety, depression, irritability, and anger triggered by both minor and major life events. Cognitively, it may result in difficulty in concentration, memory, and...
155
Components of Stress01:23

Components of Stress

Stress analysis under multiple loading conditions is intricate, necessitating a comprehensive grasp of normal and shearing stresses. Consider a small cube at point O, subjected to stress on all six faces, visible or not. Normal stress components σx, σy, σz act perpendicularly to the x, y, and z axes. Shearing stress components τxy and τxz are exerted on faces perpendicular to these axes.
Interestingly, the hidden cube faces also experience these stresses, equal and...
258