Related Experiment Video
Updated: Aug 17, 2025

Emergency Undocking in Robotic Surgery: A Simulation Curriculum
Published on: May 20, 2018
Audit of operation theater time utilization with perspective to optimize turnaround times and theater output
Vandana Pakhare1, R Gopinath1, S Kalyani Surya Dhanalakshmi1
1Department of Anaesthesiology, ESIC Medical College and Hospital, Sanathnagar, Hyderabad, Telangana, India.
Background And Aims:
Operation theater (OT) complex is an important area for a hospital as it needs expensive infrastructure, disposable, and reusable resources and a multidisciplinary highly qualified and efficient team, the metrics of which are key in generating revenue, and improved productivity. The efficient utilization of OT ensures maximum output in view of the investment of highly qualified doctors, equipment, and outcomes. Our study aimed to evaluate the utilization of OT functioning stepwise, reasons for delays, case cancellations, and areas of improvement if any.
Material And Methods:
This prospective observational study was planned in three phases; in phase 1 audit of OT functioning was carried out for 1 month and based on data analysis recommendations were given for improvement. In phase 2, the recommendations would be implemented over 3 months and in phase 3 re-audit will be carried out for 1 month. Data analysis was done on IBM SPSS version 26 software. Descriptive statistics measures were calculated by the mean and standard deviation.
Results:
The total available resource time was 52920 min and the total time utilized was 37740 min. Overall, raw utilization was 71.31%. OT was started late 63.50% times. Case cancellation occurred on 8.99% occasions.
Conclusion:
We conclude that utilization of operating room time can be maximized by proper planning and realistic scheduling of elective lists, communication among team members, and resource management. Audit of OT utilization is an important tool to identify problem areas and formulate protocols accordingly.
Related Concept Videos
Peripheral Artery Disease V: Postoperative Nursing Management
Cardiomyopathy VII: Pre and Post Operative Nursing Management
Methods of Documentation II: POMR
The X̄ Chart
The x̄ chart, often known as the individual control chart, is a crucial tool in statistical process control. It is designed to monitor process behavior and performance over time and is widely used in various industries to ensure that processes are operating at their optimum capacity and within specified limits.
A x̄ chart is constructed by plotting individual measurements of a quality...
Aneurysm IV: Nursing Management
Production Efficiency

