Optimization and trade-off framework for coupled green-grey infrastructure considering environmental performance

Xinyu Dong1, Wenxuan Yi2, Peng Yuan3

  • 1State Key Laboratory of Environmental Criteria and Risk Assessment, Chinese Research Academy of Environmental Science, Beijing, 100012, China; School of Public Affairs, Zhejiang University, Hangzhou 310058, China.

Summary

This study introduces a new environmental benefit index for runoff control infrastructure. Findings show green infrastructure offers superior environmental performance, becoming comparable to grey infrastructure when environmental benefits are considered alongside cost and hydrology.

Related Concept Videos

Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
92
Design Example: Sustainability in Concrete Building01:26

Design Example: Sustainability in Concrete Building

As the construction industry moves towards more eco-friendly practices, concrete's adaptability and its ability to incorporate sustainable features make it a key material in the drive towards greener building solutions.
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
213
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
89
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
172
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
158
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
104