Assessing the safe haven property of the gold market during COVID-19 pandemic

Afees A Salisu1,2, Ibrahim D Raheem1,2, Xuan Vinh Vo2,3

  • 1Centre for Econometric & Allied Research, University of Ibadan, Ibadan, Nigeria.

International Review of Financial Analysis
|December 19, 2022
PubMed

Related Concept Videos

Testing a Claim about Standard Deviation01:19

Testing a Claim about Standard Deviation

A complete procedure to test a claim about population standard deviation or population variance is explained here.
The hypothesis testing for the claim of population standard deviation (or variance) requires the data and samples to be random and unbiased. The population distribution also must be normal. There is no specific requirement on the sample size as the estimation is based on the chi-square distribution.
As a first step, the hypothesis (null and alternative) concerning the claim about...
2.5K
Survey Safety01:28

Survey Safety

Surveying near highways, rough terrain, or power lines involves significant risks. Working along highways is particularly dangerous and requires the use of warning signs and flagmen. It is safest to avoid working directly on roads and use offsets whenever possible. When highway work is unavoidable, it must follow all safety guidelines. Surveyors should wear bright clothing, such as orange reflective vests, to ensure visibility to motorists, coworkers, and hunters. In construction zones, wearing...
73
Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
89