Critical delay factors for construction projects in Central Aceh District, Indonesia
Anita Rauzana1, Aghnia Zahrah2, Wira Dharma3
1Department of Civil Engineering, Universitas Syiah Kuala, Banda Aceh, 23111, Indonesia.
Identifying construction project delays in Central Aceh is crucial. Eight key risk factors, including tool malfunction and poor planning, significantly impact project timelines and viability.
Area of Science:
- Construction Management
- Risk Assessment
- Project Viability
Background:
- Rapid construction development in Indonesia, particularly Central Aceh District, necessitates understanding project risks.
- Project delays can lead to significant cost overruns and financial losses, impacting overall project success.
- Identifying causal factors for construction delays is essential for effective project management.
Purpose of the Study:
- To identify risk factors contributing to construction project delays in Central Aceh.
- To determine the specific risk factors with the most substantial influence on project timelines.
Main Methods:
- Utilized primary data from questionnaires distributed to contractor companies in Central Aceh.
- Incorporated secondary data from relevant literature for comprehensive analysis.
- Employed validity tests, reliability tests, and descriptive analysis for data processing.
Main Results:
- Eight risk factors were identified as having a "very high influence" (Mode=5) on project delays.
- Key influential factors include tool malfunction, inaccurate cost estimation, and poor project planning.
- Other significant factors involve increased work costs, new technology implementation, specification issues, worker disputes, and site accessibility.
Conclusions:
- Out of 80 identified risk factors, eight were pinpointed as having a critical impact on construction projects in Central Aceh.
- These findings provide actionable insights for contractors to manage risks effectively.
- Understanding and mitigating these high-influence factors can prevent project losses.
More Related Videos
05:58Author Spotlight: Advancing Coral Culture - Creating a Semi-Quantitatively Controlled Microenvironment System to Counter Current Limitations
Published on: July 21, 2023
04:35Author Spotlight: Simulation and Analysis of the Temperature Rise of Ring Main Unit Equipment
Published on: July 5, 2024
Related Concept Videos
Retarders
The function of retarders is to delay the setting of concrete, and this effect can be measured using a penetration test. The retardation process involves adding...
Design Example: Managing Concrete Workability
Hot Weather Concreting
Mitigating the heat increase in concrete can be economically achieved by shading aggregate stockpiles to prevent heating from solar radiation,...
Cold Weather Concreting
To counteract the negative impacts of cold weather, ensuring...
Mass Concreting
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
Factors Affecting Workability