Critical delay factors for construction projects in Central Aceh District, Indonesia

Anita Rauzana1, Aghnia Zahrah2, Wira Dharma3

  • 1Department of Civil Engineering, Universitas Syiah Kuala, Banda Aceh, 23111, Indonesia.

F1000Research
|January 30, 2023
PubMed
Summary

Identifying construction project delays in Central Aceh is crucial. Eight key risk factors, including tool malfunction and poor planning, significantly impact project timelines and viability.

Related Concept Videos

Retarders01:19

Retarders

Retarders are chemical admixtures designed to extend the setting time, which is especially useful when there is a delay in sequential concrete pours to prevent cold joints and to achieve a cohesive structure. Retarders, when used in appropriate amounts, can also enhance the architectural appearance of exposed aggregate finishes.
The function of retarders is to delay the setting of concrete, and this effect can be measured using a penetration test. The retardation process involves adding...
93
Design Example: Managing Concrete Workability01:14

Design Example: Managing Concrete Workability

This example deals with managing the workability of concrete for a raft foundation project under hot weather conditions. Workability is crucial for ensuring the concrete is easy to place, compact, and finish. In this scenario, a slump test — a common method to measure the workability of fresh concrete — initially indicated low workability. This was attributed to the rapid water loss from the concrete mix, exacerbated by the high temperatures causing the course aggregates to heat up.
107
Hot Weather Concreting01:20

Hot Weather Concreting

Concreting at elevated temperatures accelerates the hydration process, leading to quicker setting but potentially reducing the long-term strength of the concrete structure. Additionally, low air humidity fosters rapid moisture loss from the concrete, resulting in reduced workability, pronounced plastic shrinkage, and a higher likelihood of crazing.
Mitigating the heat increase in concrete can be economically achieved by shading aggregate stockpiles to prevent heating from solar radiation,...
107
Cold Weather Concreting01:27

Cold Weather Concreting

When freshly poured concrete is exposed to freezing temperatures before it has set, the water within the concrete can freeze. This expansion disrupts the setting process, delays chemical reactions necessary for hardening, and increases the volume of pores within the hardened concrete, which weakens its overall structure. If the concrete manages to reach an appreciable strength before it freezes, the damage can be somewhat mitigated.
To counteract the negative impacts of cold weather, ensuring...
101
Mass Concreting01:22

Mass Concreting

Mass concreting refers to the process of placing large volumes of concrete, such as in gravity dams. The heat generated during the cement hydration process and differential cooling rates within the concrete mass can lead to a temperature gradient, which can result in thermal cracks in the concrete mass.
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
103
Factors Affecting Workability01:24

Factors Affecting Workability

The workability of concrete is a critical characteristic that influences the ease of mixing, handling, and finishing the concrete. It is affected by several factors including water content, aggregate properties, and admixtures like air entrainment. Water plays a fundamental role as it lubricates the concrete mix, facilitating easier movement and placement. However, the water requirement varies depending on the texture and shape of aggregates. Finer particles and angular, rough-textured...
100