Drilling and blasting designs for parallel hole cut and V-cut method in excavation of underground coal mine galleries

Ozgur Yilmaz1

  • 1Department of Mining and Mineral Extraction, Zonguldak Vocational School, Zonguldak Bülent Ecevit University, 67500, Zonguldak, Turkey. oyilmaz@beun.edu.tr.

Scientific Reports
|February 11, 2023
PubMed

Related Concept Videos

Quarrying of Stone01:15

Quarrying of Stone

Quarrying is the process of extracting stone from a quarry, where specialized techniques are employed to remove large blocks of stone safely and efficiently. This process can involve controlled explosions or more precision-oriented methods such as cutting and drilling.
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
160
Brick Cutting Techniques01:08

Brick Cutting Techniques

Brick-cutting techniques involve various tools and methods to shape bricks for construction. A mason's hammer with a chisel-pointed end is used for basic shaping through sharp, precise strikes. For more complex shapes requiring higher precision, a power saw with a water-cooled diamond blade is used.
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
204
Vibrating Concrete01:19

Vibrating Concrete

Mechanical vibrators are instrumental in compacting newly poured concrete within formwork and around reinforcements. This process is essential to eliminate trapped air pockets and establish a dense concrete mass. One widely used method is vibrating by internal vibrators, often referred to as a poker vibrator or immersion vibrator. It is rapidly inserted through the full depth of the freshly laid concrete and slightly extends into the layer below it (which remains in a plastic state). Consistent...
149
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
102
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
167