Lifetime impact of achondroplasia study in Europe (LIAISE): findings from a multinational observational study

Mohamad Maghnie1,2, Oliver Semler3,4, Encarna Guillen-Navarro3,5,6

  • 1Department of Pediatrics, IRCCS Istituto Giannina Gaslini, Genoa, Italy.

Abstract

Related Concept Videos

Changes in the Appendicular Skeleton with Age01:09

Changes in the Appendicular Skeleton with Age

The upper and lower limb initially develops as a small bulge called a limb bud, which appears on the lateral side of the early embryo. The upper limb bud appears near the end of the fourth week of development, with the lower limb bud appearing shortly after.
Initially, the limb buds consist of a core of mesenchyme covered by a layer of ectoderm. The ectoderm at the end of the limb bud thickens to form a narrow crest called the apical ectodermal ridge. This ridge stimulates the underlying...
2.1K
Longitudinal Research02:20

Longitudinal Research

Sometimes we want to see how people change over time, as in studies of human development and lifespan. When we test the same group of individuals repeatedly over an extended period of time, we are conducting longitudinal research. Longitudinal research is a research design in which data-gathering is administered repeatedly over an extended period of time. For example, we may survey a group of individuals about their dietary habits at age 20, retest them a decade later at age 30, and then again...
12.0K
Lethal Alleles02:41

Lethal Alleles

Agouti: A Lethal Allele
Lucien Cuénot discovered lethal alleles in 1905 while studying the inheritance of coat color in mice. The agouti gene is responsible for the color of the coat in mice. This gene codes for an agouti-signaling protein, which is responsible for melanin distribution in mammals. The wild-type allele gives rise to gray-brown coat color in mice, while the mutant allele gives rise to yellow coat color. In addition to coat color, the agouti gene is associated with the yellow...
15.6K
Longitudinal Studies01:26

Longitudinal Studies

Longitudinal studies are also widely used in other medical and social science fields. For instance, in cardiovascular research, they can monitor patients' health over decades to identify risk factors for heart disease, such as high cholesterol or smoking, and evaluate the long-term effectiveness of preventive measures. Similarly, in mental health studies, researchers might follow individuals from adolescence into adulthood to understand the development and progression of conditions like...
194
Nature and Nurture01:10

Nature and Nurture

Many human characteristics, like height, are shaped by both nature—in other words, by our genes—and by nurture, or our environment. For example, chronic stress during childhood inhibits the production of growth hormones and consequently reduces bone growth and height. Scientists estimate that 70-90% of variation in height is due to genetic differences among individuals, and 10-30% of variation in height is due to differences in the environments that individuals experience,...
20.6K