Robust Bottom-Up Gold Filling of Deep Trenches and Gratings

D Josell1, W Osborn2, M E Williams1

  • 1Materials Science and Engineering Division, National Institute of Standards and Technology, Gaithersburg, Maryland 20899, USA.

Summary

This study demonstrates void-free gold electrodeposition in deeper trenches using a bottom-up approach. This advanced technique enhances device architectures by ensuring uniform, dense metal filling.

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
101
Placing Concrete01:17

Placing Concrete

The concrete is placed as close as possible to its final position to avoid segregation. The placed concrete is then fully compacted to expel the entrapped air, and the next layer of concrete is laid while the underlying layer is still in the plastic state. The rate at which concrete is placed and compacted is kept equal.
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
162
Design Example: Distributing Reinforcements in Concrete Sections01:22

Design Example: Distributing Reinforcements in Concrete Sections

The topic explores the practical aspects of adjusting steel reinforcements within a concrete beam section to meet specific design requirements. When designing a reinforced concrete beam, it is essential to distribute the steel reinforcements properly to ensure structural integrity and efficiency. The example provided details a scenario where a beam requires a total steel cross-section of 4 square inches. The engineer identifies that the available steel bars have a nominal diameter of 1.693...
124
Preplaced Aggregate Concrete01:29

Preplaced Aggregate Concrete

Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
123
Vibrating Concrete01:19

Vibrating Concrete

Mechanical vibrators are instrumental in compacting newly poured concrete within formwork and around reinforcements. This process is essential to eliminate trapped air pockets and establish a dense concrete mass. One widely used method is vibrating by internal vibrators, often referred to as a poker vibrator or immersion vibrator. It is rapidly inserted through the full depth of the freshly laid concrete and slightly extends into the layer below it (which remains in a plastic state). Consistent...
144
Design Example: Joints in Concrete Pavements01:28

Design Example: Joints in Concrete Pavements

Concrete pavement joints are essential for maintaining the structural integrity and longevity of pavement by controlling where and how the pavement cracks. These joints can be categorized based on their functions, such as contraction or control joints, construction joints, isolation joints, and expansion joints.
Contraction joints are typically formed by sawing a groove into the concrete shortly after it has hardened. This creates a weakened vertical plane, deliberately encouraging cracking at...
230