Abstract:
To promote the development of green and low-carbon expressway construction, an evaluation index system and associated evaluation method for the construction of green and low-carbon expressways suitable for multiple bridges and tunnels is proposed. The evaluation index system was created from three layers: the goal layer, the criterion layer, and the indicator layer. The criterion layer includes 4 first-level indices and the indicator layer includes 18 second-level indices. The weight of each index in the criterion layer and indicator layer is determined using the improved analytic hierarchy process (AHP) method, and green and low-carbon expressway construction is then graded using the gray fuzzy comprehensive evaluation method combined quantitative indices with qualitative indices. The method with the selected indices is then verified in a case study on the Huangling-Yan'an Expressway, with the evaluation grade being "Excellent" and the evaluation value being 9.1255. The proposed evaluation method can provide theoretical and practical guidance for effective evaluation for green and low-carbon expressway construction.
Related Concept Videos
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
Design Example: Alignment of a Road Line Using GIS
Elevation of Intermediate Points on Vertical Curves
Compacting Factor test
The procedure begins by placing concrete into the upper hopper without any compaction. Once filled, the bottom door of this hopper is opened,...
Profile Leveling and Cross Sections
Measurement of Air Content in Concrete
The pressure method,...