Portuguese public procurement data for construction (2015-2022)
Luís Jacques de Sousa1,2, João Poças Martins1,2,3, Luís Sanhudo3
1Faculty of Engineering of the University of Porto (FEUP), 4200-465 Porto, Portugal.
Abstract:
The Architecture, Engineering and Construction (AEC) sector currently exhibits a significant scarcity of systematised information in databases (DB). This characteristic is a relevant obstacle to implementing new methodologies in the sector, which have proven highly successful in other industries. In addition, this scarcity also contrasts with the intrinsic workflow of the AEC sector, which generates a high volume of documentation throughout the construction process. To help solve this issue, the present work focuses on the systematisation of the data related to the contracting and public tendering procedure in Portugal, summarising the steps to obtain and process this information through the use of scraping algorithms, as well as the subsequential translation of the gathered data into English. The contracting and public tendering procedure is one of the most well-documented procedures at the national level, having all its data available as open-access. The resulting DB comprises 5214 unique contracts, characterised by 37 distinct properties. This paper identifies future development opportunities that can be supported by this DB, such as the application of descriptive statistical analysis techniques and/or Artificial Intelligence (AI) algorithms, namely, Machine Learning (ML) and Natural Language Processing (NLP), to improve construction tendering.
Related Concept Videos
Aggregate Cement Ratio
GIS Software, Hardware, and Sources of GIS Data
Preplaced Aggregate Concrete
Ferrocement
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground...
Construction of Frequency Distribution
First, make a table with two columns—one with the title of the data that needs to be organized, and the other column for frequency. [Draw a third column for tally marks if needed]. Then, take a look at the items given in the data set and decide if an ungrouped frequency distribution table or a grouped frequency distribution table would be more suitable. If there are large sets of different values, then it is...