Related Experiment Video
Updated: Aug 3, 2025

Adapted Resistance Training Improves Strength in Eight Weeks in Individuals with Multiple Sclerosis
Published on: January 29, 2016
Accuracy of Predicted Intraset Repetitions in Reserve (RIR) in Single- and Multi-Joint Resistance Exercises Among
Jacob F Remmert1,2, Kelly R Laurson1, Michael C Zourdos2
1School of Kinesiology and Recreation, Illinois State University, Normal, IL, USA.
Abstract:
We assessed the accuracy of intraset repetitions in reserve (RIR) predictions on single-joint machine-based movements of trained and untrained men and women. Participants were 27 men (M age = 22, SE = 0.6 years; M weight = 90.8, SE = 4.0 kg; M height = 182.3, SE = 1.4 cm; M training experience = 66, SE = 9 months) and 31 women (M age = 20, SE = 0.4 years; M weight = 67.8, SE = 2.3 kg; M height = 167.6, SE = 1.1 cm; M training experience = 22, SE = 4 months). In one session, participants performed a five-repetition maximum (5RM) test on biceps curl, triceps pushdown, and seated row exercises; we then estimated one repetition maximum (1RM). Participants then performed four sets of each exercise, in a randomized order, to the point of momentary muscular failure at 72.5% of 1RM. During each set, participants indicated when they first perceived 5RIR and then predicted RIR on every repetition thereafter until failure. The difference between actual repetitions performed and predicted repetitions at each intraset prediction was determined to be the RIR difference (RIRDIFF). A 3-way repeated measures ANCOVA found that a 3-way interaction was not statistically significant (p = 0.435) and no covariates of sex (p = 0.917), training experience (p = 0.462) nor experience rating RIR significantly affected RIRDIFF (p = 0.462-0.917). There were significant main effects for the proximity to failure of the prediction and the set number (p < 0.01) but not for exercise (p = 0.688). Thus, intraset RIR predictions were more accurate when closer to failure and in later sets, but sex, training experience, and experience rating RIR did not significantly influence RIR prediction accuracy on machine-based single-joint exercises.
More Related Videos
Related Concept Videos
Uncertainty in Measurement: Accuracy and Precision
Prediction Intervals
However, the point estimate is most likely not the exact value of the population parameter, but close to it. After calculating point estimates, we construct interval estimates, called confidence intervals or prediction intervals. This prediction interval comprises a range of values unlike the point estimate and is a better predictor of the observed sample value, y.
Accuracy and Precision

