Related Experiment Video
Updated: Jul 30, 2025

Kinematic History of a Salient-recess Junction Explored through a Combined Approach of Field Data and Analog Sandbox Modeling
Published on: August 5, 2016
Assessment of Floor Heave Associated with Bumps in a Longwall Mine Using the Discrete Element Method
1Mine Safety Branch, Spokane Mining Research Division, CDC/NIOSH, 315 E Montgomery Avenue, Spokane, WA 99207, USA.
Abstract:
This study was developed as part of an effort by the National Institute for Occupational Safety and Health (NIOSH) to better understand rock-mass behavior in longwall coal mines in highly stressed, bump-prone ground. The floor-heave and no-floor-heave phenomena at a western US coal mine could not be properly simulated in numerical models using conventional shear-dominant failure criteria (i.e., Mohr-Coulomb or Hoek-Brown failure criterion). The previous numerical study demonstrated these phenomena using a user-defined model of the s-shaped brittle failure criterion in conjunction with a spalling process in the FLAC3D numerical modeling software. The results of the FLAC3D modeling agreed with the observations of the relative amounts of heave from each gate-road system. However, the FLAC3D model adopted many assumptions and simplifications that were not very realistic from a physical or mechanical perspective. To overcome the limitations of the FLAC3D model, 3DEC modeling in conjunction with the discrete fracture network (DFN) technique was performed to better understand the true behavior of floor heave associated with underground mining in an anisotropic stress field. The effect of stress rotation in the mining-induced stress field was considered by using a different geometry of rock fractures in the coal seam. The heterogeneity of the engineering properties (i.e., cohesion and tensile strength) were also considered by using Monte Carlo simulations. Consequently, the 3DEC models using the DFN technique resulted in predictions of floor heave that agreed with observations of the relative amounts of heave from each gate-road system, but the cause of heave was mainly related to the degree of anisotropy instead of the size of the pillar.
More Related Videos
08:58Atomic Force Microscopy Cantilever-Based Nanoindentation: Mechanical Property Measurements at the Nanoscale in Air and Fluid
Published on: December 2, 2022
10:27A Uniaxial Compression Experiment with CO2-Bearing Coal Using a Visualized and Constant-Volume Gas-Solid Coupling Test System
Published on: June 12, 2019
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Dynamic Modulus of Elasticity of Concrete
The sonic test is a common method to determine the dynamic modulus. In this test, a concrete beam, sized either 6 x 6 x 30 inches or 4 x 4 x 20 inches, is clamped at its center. Vibrations are initiated at one end of the beam by an electromagnetic exciter unit powered by...
Beams with Unsymmetric Loadings
The first moment-area theorem determines the slope at any point on the beam. This theorem indicates that the change in slope between two points on a beam...
Shear on the Horizontal Face of a Beam Element
Beams with Symmetric Loadings
The M/EI...
Shear and Bending Moment Diagram: Problem Solving
Draw a Free-Body Diagram: Start by drawing a free-body diagram of the entire beam, including the concentrated loads, distributed load, and reaction...