Evaluation on displacement risks of dismantling temporary lining in tunnel and optimization on temporary lining
Huijian Zhang1, Kai Liu2, Pan Cao1
1School of Civil Engineering, Key Laboratory of Transportation Tunnel Engineering, Ministry of Education, Southwest Jiaotong University, No. 111, North Section, Second Ring Road, Jinniu District, Chengdu, 610031, Sichuan, China.
Abstract:
In tunnel engineering, the temporary lining is adopted as an effective countermeasure in mitigating tunnel failure potential, often featured by extra-large cross-sections and/or driven through weak ground conditions. However, dismantling temporary linings negatively impacts primary linings. In this paper, the comprehensive research is conducted on the displacement risk caused by dismantling temporary lining based on two alternative tunneling methods (TM-1 and TM-2). Besides, the following three influence factors are taken into consideration: the axial forces in temporary linings, the thickness of preliminary linings, and the deformation modulus of ground. After that, the tunneling method optimization plan is proposed from the view of these three influence factors. The results show that TM-1 always induces invert uplift, whereas TM-2 mainly brings about invert uplift or sidewall bulging depending on which transverse or vertical linings are dominant in terms of axial force values. For TM-2, the axial force in transverse linings can suppress the development of maximum deformation increment (MDI) value at invert when the axial forces in transverse linings are smaller than those in vertical linings. It is also found that with the further increase of the axial force in transverse linings in TM-2, MDI relocates to the sidewall. Moreover, on the basis of the displacement risk evaluations, an optimization on the temporary lining configurations has been developed by replacing temporary linings with pre-tension anchor cables to reduce the risk of dismantling temporary linings. All the research results can provide some important reference for the similar tunnel engineering in the future.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Design Example: Alignment of a Road Line Using GIS
Expansion and Contraction in Masonry Walls
To...
Cavity Drainage and Flashings in Masonry walls
Weep holes, strategically placed at the base of the cavity, are critical for draining accumulated water. These openings are created by leaving head...
Masonry Curtain Walls