Related Experiment Video
Updated: Jul 16, 2025

11:53
The Modular Design and Production of an Intelligent Robot Based on a Closed-Loop Control Strategy
Published on: October 14, 2017
11.7K
Algorithm for Automatic Rod Feeding and Positioning Error Compensation for Underground Drilling Robots in Coal Mines.
Qianhai Lu1,2, Lingfei Kong1, Guangyu Peng2
1School of Mechanical and Precision Instrument Engineering, Xi'an University of Technology, Xi'an 710048, China.
Sensors (Basel, Switzerland)
|September 9, 2023
Summary
This study introduces an algorithm to improve the positioning accuracy of automatic rod feeding in coal mine drilling robots. The new method reduces accidents by compensating for errors in the automated drilling process.
Area of Science:
- Robotics and Automation
- Mining Engineering
- Geotechnical Engineering
Background:
- Automation in underground coal mining is critical for efficiency and safety.
- Current automatic rod feeding systems lack positional accuracy, leading to accidents.
Purpose of the Study:
- To develop and validate an algorithm for compensating positioning errors in automatic rod feeding for coal mine drilling robots.
Main Methods:
- Calibration of pull rope sensors for precision.
- Development of a theoretical mathematical model using spatial coordinate transformations.
- Manual teaching for target position determination.
- Anisotropic spatial difference compensation considering distance and direction.
Main Results:
- The proposed algorithm significantly enhances the accuracy of rod feeding positions.
- Validation through practical tests on a coal mine underground drilling robot.
Conclusions:
- The developed algorithm effectively addresses positioning inaccuracies in automatic rod feeding.
- Implementation can lead to safer and more efficient underground drilling operations.
More Related Videos
Related Concept Videos
Common Leveling Mistakes and Errors
96
A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
96
Machines: Problem Solving II
335
Machines are complex structures consisting of movable, pin-connected multi-force members that work together to transmit forces. Consider a lifting tong carrying a 100 kg load. It comprises movable sections DAF and CBG linked together with member AB.
335
Relative Motion Analysis using Rotating Axes-Problem Solving
421
Consider a crane whose telescopic boom rotates with an angular velocity of 0.04 rad/s and angular acceleration of 0.02 rad/s2. Along with the rotation, the boom also extends linearly with a uniform speed of 5 m/s. The extension of the boom is measured at point D, which is measured with respect to the fixed point C on the other end of the boom. For the given instant, the distance between points C and D is 60 meters.
Here, in order to determine the magnitude of velocity and acceleration for point...
Here, in order to determine the magnitude of velocity and acceleration for point...
421

