Construction practice of water conveyance tunnel among complex geotechnical conditions: a case study
Kaimin Duan1, Guofeng Zhang2, Hui Sun3
1Changjiang Institute of Technology, Wuhan, Hubei, China.
Abstract:
The construction practice of water conveyance tunnels often encounters various complex geotechnical engineering conditions, which bring huge challenges to the design and construction of water conveyance tunnels. Based on the theory of rock elastic-plastic mechanics and finite element analysis technology, this article carried out investigations of engineering geological features, geological formations and hydrological conditions establishes a calculation model for the 3# water conveyance tunnel of the Fenhe River Diversion Project, and analyzes the variation law of surrounding rock stress and displacement during TBM excavation of the tunnel. The results indicate that the dominant direction of the rock mass principal stress measured by the hydraulic fracturing method is NE84°, and the maximum horizontal principal stress, minimum horizontal principal stress, and vertical stress decrease sequentially, analyzing the characteristics of shield TBM construction technology, it is applied to the construction of water transfer tunnels. The numerical simulation of TBM construction using FLAC3D software shows that as the excavation surface advances, the subsidence value of the tunnel roof first slowly increases, then rapidly increases, and then tends to stabilize. The horizontal displacement of the surrounding rock is increasing. The maximum principal stress of the surrounding rock gradually increases. The final surrounding rock stress is 35 MPa. The TBM shield machine with mud water balance driven by indirectly controlled frequency conversion motor is selected for TBM construction of the tunnel. The study offers statistical information to support tunneling technology for water conveyance in the geotechnical engineering practice.
More Related Videos
Related Concept Videos
Design Example: Design of an Irrigation Channel
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Preplaced Aggregate Concrete
Design Example: Managing Concrete Workability
Multiple Pipe Systems
Series Configuration
In a series configuration, fluid flows sequentially from one pipe...
Design Example: Analyzing Capacity Contours for Flood Risk Assessment