Safety and environmental impact control of cross passage construction in soft soil strata using tunnel boring machine
Ma Yunkang1, Yan Wei1, Song Yanjie2
1Tianjin Metro Group Co., Ltd, Tianjin, 300392, China.
Abstract:
The construction of cross passages using the tunnel boring machine (TBM) method represents an emerging construction technique with numerous advantages. However, owing to the scarcity of application instances, the safety control methodologies and the regulatory patterns concerning environmental impacts remain inconclusive. In this study, a cross passage excavated using the TBM method-the first of its kind in the Tianjin area-was investigated. We identified the key risk control measures for the construction and analysed the TBM operating parameters, monitored ground and building settlements, and monitored mainline tunnel deformations and mechanical responses, revealing the ground and tunnel structure deformation patterns. The following conclusions are drawn. (1) The ground surrounding the cross-passage break-out opening was stabilised by performing secondary grouting and small-range freezing, and the break-in opening was excavated using a completely enclosed steel sleeve. These measures prevented water and sand inflows during the excavation of the break-out and break-in openings in the silt and silty sand strata. (2) The torsional moment of the cutter disc was large during the break-out phase. Break-out mainline tunnel displacement monitoring data indicated that the thrust had a significant effect on the mainline tunnel during the break-out phase. (3) The TBM tunnelling caused ground loss. The ground settlement exhibited a U-shaped distribution along the cross-passage axis, with the maximum settlement being 10 mm. (4) During the break-out phase, the deformation of the break-out mainline tunnel exhibited a duck-egg-shaped distribution. The clearance convergence of the break-out mainline tunnel was within ± 4, and the clearance convergence of the break-in mainline tunnel was controlled within ± 1 mm.
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Survey Safety
Placing Concrete
While placing concrete, care is taken to ensure that the concrete is laid in uniform layers, and hand shoveling and moving concrete using poker vibrators is avoided. Also,...
Mass Concreting
To reduce the risk of such cracking, the concrete mix may incorporate low-heat cement and pozzolans to reduce the temperature rise. Pre-cooled angular aggregates and water-reducing admixtures...
Design Example: Alignment of a Road Line Using GIS
Design Example: Managing Concrete Workability