Study on the effect of excavation sequence of three-hole shield tunnel on surface settlement and segment deformation

You Wang1, Fang Dai2, Bosong Ding2

  • 1School of Civil Engineering, Central South University, Changsha, 410075, China. ywang1920@csu.edu.cn.

Scientific Reports
|October 8, 2023
PubMed

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
76
Types of Building Separation Joints01:23

Types of Building Separation Joints

Building separation joints divide large or complex building structures into smaller, discrete units that can move independently. These joints are categorized into three types: volume-change joints, settlement joints, and seismic separation joints.
Volume-change joints address the effects of expansion and contraction due to temperature and moisture variations. They are strategically placed at discontinuities in a building's mass where cracking is most likely and are spaced about 150 to 200...
240
Segregation in Fresh Concrete01:16

Segregation in Fresh Concrete

Segregation in fresh concrete is a phenomenon where the components of the concrete mix separate, leading to uneven distribution and compromised structural integrity. This separation typically occurs when concrete is subjected to excessive horizontal movement within forms, or when it is dropped from considerable heights or forced through narrow, winding paths. As a result, heavier coarse aggregate particles settle at the bottom, while lighter, finer materials such as cement and water rise to the...
148
Preplaced Aggregate Concrete01:29

Preplaced Aggregate Concrete

Preplaced aggregate concrete is ideal for construction environments that are not easily accessible. The process begins by properly wetting the gap-graded coarse aggregates to remove the dirt, then placing it in the form and compacting it. Voids are filled with a mortar mix pumped under pressure through slotted pipes. This mortar typically consists of Portland cement, pozzolan, fine aggregates, water, and a fluidizing aid. The pozzolan helps reduce bleeding and segregation while improving the...
101
Field Procedure for Staking Out Curves01:26

Field Procedure for Staking Out Curves

Staking out curves is an essential process in construction to ensure the accurate alignment of structures along a curved path. This task involves positioning stakes at calculated locations corresponding to the curve's design, effectively translating plans into physical markers in the field. The process begins by determining the geometric parameters of the curve, including the radius, central angle, and tangent distances. These parameters are critical for identifying key points such as the...
53
Thin-Walled Hollow Shafts01:15

Thin-Walled Hollow Shafts

In analyzing a thin-walled hollow shaft subjected to torsional loading, a segment with width dx is isolated for examination. Despite its equilibrium state, this segment faces torsional shearing forces at its ends. These forces are quantitatively described by the product of the longitudinal shearing stress on the segment's minor surface and the area of this surface, leading to the concept of shear flow. This shear flow is consistent throughout the structure, indicating a uniform distribution...
198