Wearable Prophylaxis Tool for AI-Driven Identification of Early Warning Patterns of Pressure Ulcers

Lorenz Gruenerbel1, Ferdinand Heinrich1, Jonathan Böhlhoff-Martin2

  • 1Fraunhofer Institute for Electronic Microsystems and Solid State Technologies EMFT, 80686 Munich, Germany.

PubMed

Related Concept Videos

PPE Use in Healthcare Settings I: Donning01:22

PPE Use in Healthcare Settings I: Donning

Donning PPE must be completed before contact with the patient. This process protects from infectious agents. The sequence and action included in each donning are critical, and the steps must be systematic to avoid exposure to pathogens. The institutional policy also needs to be followed while donning PPE. The pre-donning preparations are gathering equipment, inspecting the PPE equipment for tears, holes, or damage, removing jewelry, removing any garments below the elbows, and tying the hair...
992
PPE Use in Healthcare Settings II: Doffing01:10

PPE Use in Healthcare Settings II: Doffing

The sequence of removing or doffing PPE starts with the gloves, as they are the most contaminated. Next is removal of the face shield or goggles, as they would interfere with removing other PPE. Then remove the gown, followed by the mask or respirator. Perform hand hygiene between steps if hands become contaminated and immediately after removing all PPE. Generally, the outside front and sleeves of the isolation gown, the goggles or the mask, the respirator, and the face shield are contaminated.
930
Assessing Blood pressure using a doppler ultrasound01:19

Assessing Blood pressure using a doppler ultrasound

To obtain accurate blood pressure measurements in clinical settings, especially when traditional methods are insufficient, healthcare professionals utilize the Doppler ultrasound technique. This method uses high-frequency sound waves to detect blood flow within the arteries, which is crucial for patients with conditions that complicate circulatory system assessment.
Pre-Procedural Guidelines for Doppler Ultrasound Blood Pressure Assessment:
Preparation of Equipment:
1.4K