Related Experiment Video
Updated: Jul 9, 2025

Setting Up a Stroke Team Algorithm and Conducting Simulation-based Training in the Emergency Department - A Practical Guide
Published on: January 15, 2017
Barriers and facilitators for developing a prehospital emergency care system evaluation tool (PEC-SET) for
Anjni Joiner1,2,3, Audrey L Blewer2,4, Pin Pin Pek2,5
1Duke University School of Medicine, Durham, North Carolina, USA anjni.joiner@duke.edu.
Objectives:
Strengthening of emergency care systems, including prehospital systems, can reduce death and disability. We aimed to identify perspectives on barriers and facilitators relating to the development and implementation of a prehospital emergency care system assessment tool (PEC-SET) from prehospital providers representing several South and Southeast (SE) Asian countries.
Design:
We conducted a qualitative study using focus group discussions (FGD) informed by the Consolidated Framework for Implementation Research (CFIR). FGDs were conducted in English, audioconferencing/videoconferencing was recorded, transcribed verbatim and coded using an inductive and deductive approach. Participants suggested specific elements to be measured within three main 'pillars' of disease conditions proposed by the research team of the tool being developed (cardiovascular, trauma and perinatal emergencies).
Setting:
We explored the perspectives of medical directors in six low-income and middle-income countries (LMICs) in South and SE Asia.
Participants:
A total of 16 participants were interviewed (1 Vietnam, 4 Philippines, 4 Thailand, 5 Malaysia, 1 Indonesia and 1 Pakistan) as a part of 4 focus groups.
Results:
Themes identified within the four CFIR constructs included: (1) Intervention characteristics: importance of developing an contextually specific tool, need for generalisability, trialling in one geographical area or with one pillar before expanding; (2) Inner setting: data transfer barriers, workforce shortages; (3) Outer setting: underdevelopment of EMS nationally; need for further EMS system development prior to implementing a tool and (4) Individual characteristics: lack of buy-in by prehospital personnel. Elements proposed by participants included both process and outcome measures.
Conclusions:
Through the CFIR framework, we identified several themes which can provide a basis for codeveloping a PEC-SET for LMICs with local stakeholders. This work may inform development of quality improvement tools in LMIC PEC systems.
Related Concept Videos
SBAR II: Application of SBAR
SBAR Report from a Nurse to a Health Care Provider
S: "Hello, Dr. Smith. This is Jane, RN, from the Med Surg unit. I am calling to tell you about Ms. White in Room 210, who is experiencing increased pain and redness at her incision site. Her recent...
Methods Of Healthcare Delivery System
Managed Care System:
The managed care system is designed to control the cost while maintaining the quality of care. The patient's care from admission to discharge is planned by the primary care provider or the case manager, also known as the gatekeeper. In a managed care system, the number of care providers is...

