A novel lifting point location optimization method of transmission line tower based on improved grey wolf optimizer

Guolin Wang1, Pengjie Ding2, Chaosheng Huang1

  • 1Zhejiang Electric Transmission and Transformation Co., Ltd., Hangzhou, 310000, China.

Scientific Reports
|December 11, 2023
PubMed

Related Concept Videos

Transmission Line Design Considerations01:23

Transmission Line Design Considerations

Aluminum has become the material of choice for overhead transmission lines, surpassing copper due to its abundance and cost-effectiveness. The most prevalent type is the aluminum conductor, steel-reinforced (ACSR), which combines aluminum strands around a steel core. Other variants include all-aluminum conductors (AAC), all-aluminum alloy conductors (AAAC), aluminum conductor alloy-reinforced (ACAR), and aluminum-clad steel conductors. Advanced designs, such as aluminum conductors with steel...
136
Maximum Power Flow and Line Loadability01:23

Maximum Power Flow and Line Loadability

The maximum power flow for lossy transmission lines is derived using ABCD parameters in phasor form. These parameters create a matrix relationship between the sending-end and receiving-end voltages and currents, allowing the determination of the receiving-end current. This relationship facilitates calculating the complex power delivered to the receiving end, from which real and reactive power components are derived.
119
Design of Transmission Shafts01:16

Design of Transmission Shafts

The design of a transmission shaft is governed by two primary specifications: the power it transmits and its rotational speed. These parameters guide the selection of the shaft's material and cross-sectional dimensions, ensuring that the material's maximum shearing stress remains within the elastic limit while transmitting the desired power at the given speed. The system's power is intrinsically linked to the applied torque. The torque applied to the shaft can be calculated by...
301
Distributed Loads: Problem Solving01:21

Distributed Loads: Problem Solving

Beams are structural elements commonly employed in engineering applications requiring different load-carrying capacities. The first step in analyzing a beam under a distributed load is to simplify the problem by dividing the load into smaller regions, which allows one to consider each region separately and calculate the magnitude of the equivalent resultant load acting on each portion of the beam. The magnitude of the equivalent resultant load for each region can be determined by calculating...
647
Reducing Line Loss01:18

Reducing Line Loss

In a three-phase circuit, line loss is an indicator of energy dissipated as heat due to the resistance of transmission lines. To address this, incorporating transformers into the system—a step-up transformer at the source and a step-down transformer at the load—is a strategic solution. Two three-phase transformers are introduced to improve this.
With a step-up transformer at the source, the voltage is increased, thereby reducing the current in the transmission lines since power loss...
154
Cable Subjected to a Distributed Load01:24

Cable Subjected to a Distributed Load

The analysis of suspension bridges is a complex and critical process that involves multiple factors, including the shape and tension of the main cables. The main cables of suspension bridges are subjected to distributed loads, which result in changes in tensile forces and deformation of the cable. These loads must be carefully considered to ensure that the bridge is safe and capable of supporting the weight of different loads.
692