Related Experiment Video
Updated: Aug 13, 2026

Design and Construction of an Urban Runoff Research Facility
Published on: August 8, 2014
Lead pollution from the external redecoration of old buildings
Abstract:
Lead concentrations before, during and after external redecoration have been measured in seven school playgrounds. All playgrounds showed increases in lead concentration during redecoration but the extent of contamination and duration varied enormously. The geometric mean lead value per school playground, taken on the day of the highest concentration during redecoration, ranged from 370 to 53000 micrograms g-1. The two post-war schools had significantly lower lead in dust concentrations than the other older schools.
Related Concept Videos
Bioremediation
Efflorescence in Masonry
While initial efflorescence is common post-construction and can be cleaned with water and a brush, in certain instances, efflorescence can reappear and gradually diminish over time as salts are leached out...
Design Example: Sustainability in Concrete Building
There are multiple approaches to achieve sustainability in a commercial concrete building. For instance, construct a concrete parking area under the building, utilizing pervious concrete paver blocks in open areas to facilitate rainwater collection through an underground cistern.
Acid Attack on Concrete
The rate at which hydrogen...
Corrosion of Reinforcement
However, over time and under certain conditions like carbonation, chloride ingress, and cracking this protective state can be compromised. Steel has areas with...
Acid Mine Drainage