A probabilistic early fault detection model for a feedback machining system with multiple types of spares
Mohamed Abd Allah El-Hadidy1, Assem Omar Elshenawy2
1Mathematics Department, Faculty of Science, Tanta University, Tanta, Egypt. melhadidi@science.tanta.edu.eg.
Abstract:
This paper studies corrective and preventive maintenance to provide a quality control policy. The corrective maintenance, depending on the time, of a feedback machining system model with a finite source and standbys is presented. Moreover, the system has a known number of servers to repair the damaged units, and it contains an inspector to ensure the maintenance quality of the repaired units. The exact value of the probability of n units in the system will be obtained by using an efficient algorithm that depends on the Laplace transformation. To promote the concept of preventive maintenance, we use this probability to get the probability of early fault detection as a function of time and in the steady state. The applicability of this model is discussed for different system capacities.
Related Concept Videos
Multimachine Stability
In analyzing the system, the nodal equations represent the relationship between bus voltages, machine voltages, and machine currents. The nodal equation is given by:
Feedback control systems
Linear feedback systems are theoretical models that simplify analysis and design. These systems operate under the principle that their output is directly proportional to their input within certain ranges. For instance, an amplifier in a control system behaves linearly as long as the input signal remains within a specific range. However, most physical systems exhibit inherent nonlinearity...
Types of Errors: Detection and Minimization
Absolute error in a measurement is the numerical difference from the true or central value. Relative error is the ratio between absolute error and the true or central value, expressed as a percentage.
Errors can be classified by source, magnitude, and sign. There are three types of errors: systematic, random, and gross.
Systematic or...
Time-Domain Interpretation of PD Control
Consider the example of control of motor torque. Initially, a positive...
Fatigue
Machines: Problem Solving I
The toggle clamp system is a machine structure consisting of movable, pin-connected multi-force members that form a stabilized system to transmit forces. The...


