Study on the design calculation method and construction control method of suction drum foundation for guided frame
Zhang Xin1, Li Yuansong1, Liu Mingyue2
1School of Civil Engineering and Architecture, Wuhan Institute of Technology, Wuhan, 430074, Hubei, China.
This study introduces standardized design and calculation methods for suction drum foundations in China, addressing current subjective practices. Verified with real-world offshore wind projects, these methods improve engineering reliability.
Area of Science:
- Geotechnical Engineering
- Offshore Engineering
- Foundation Design
Background:
- Lack of standardized design and calculation specifications for suction drum foundations in China.
- Current engineering design relies heavily on subjective designer experience, leading to potential inefficiencies.
- Need for systematic research to address these limitations in offshore wind projects.
Purpose of the Study:
- To develop and validate a systematic approach for the design calculation and construction control of suction drum foundations.
- To propose a sinking feasibility analysis method and a parameter value method for foundation calculations.
- To provide reliable references for similar foundation designs and constructions.
Main Methods:
- Systematic study integrating domestic and international research, design specifications, and engineering applications.
- Development of a sinking feasibility analysis method and a parameter value method for suction drum foundation calculations.
- Examination of construction process control parameters, technology, and standards, validated with field data.
Main Results:
- A comprehensive design calculation and inspection framework for suction drum foundations.
- Validated sinking feasibility and parameter value methods for foundation design.
- Successful installation of six four-barrel guided frame platform suction drum foundations, confirming method effectiveness.
Conclusions:
- The proposed design and control methods offer a standardized and reliable approach for suction drum foundations.
- The study provides valuable data and references for future offshore wind power projects in China.
- Implementation of these methods can mitigate subjectivity and enhance the safety and efficiency of foundation engineering.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Design Example: Managing Concrete Workability
Frames: Problem Solving II
Design Example: Calculating Safe Diameter for Wind-Exposed Disc
Pumped Concrete
For direct-acting pumps, the concrete enters the pump via the inlet valve under the action of gravity and suction created by the movement of the piston. This concrete is then forced into the pipeline and out through the outlet valve by the forward movement...
Design Consideration
The factor of safety is another key...