Initial development of skill with a reversed bicycle and a case series of experienced riders

Justine Magnard1,2, Timothy R Macaulay1,3, E Todd Schroeder1

  • 1Biokinesiology and Physical Therapy, University of Southern California, Los Angeles, CA, USA.

Scientific Reports
|February 21, 2024
PubMed

Related Concept Videos

Case Studies01:22

Case Studies

There are many research methods available to psychologists in their efforts to understand, describe, and explain behavior and the cognitive and biological processes that underlie it.
11.3K
Otto and Diesel Cycle01:27

Otto and Diesel Cycle

An Otto engine is a four-stroke engine that uses a mixture of gasoline and air as the working fuel. The fuel is injected into the cylinder, and the piston is moved completely down so that the cylinder is at maximum volume. By moving the piston up, adiabatic compression takes place. The spark plug ignites the gasoline-air mixture, and the burning fuel adds heat to the system at a constant volume. The heated mixture expands adiabatically and gets further cooled by exhausting heat, and this cyclic...
4.6K
Rolling Resistance: Problem Solving01:17

Rolling Resistance: Problem Solving

Rolling resistance, also known as rolling friction, is the force that resists the motion of a rolling object, such as a wheel, tire, or ball, when it moves over a surface. It is caused by the deformation of the object and the surface in contact with each other, as well as other factors like internal friction, hysteresis, and energy losses within the materials. Rolling resistance opposes the object's motion, requiring additional energy to overcome it and maintain movement. In practical...
990
Brick Cutting Techniques01:08

Brick Cutting Techniques

Brick-cutting techniques involve various tools and methods to shape bricks for construction. A mason's hammer with a chisel-pointed end is used for basic shaping through sharp, precise strikes. For more complex shapes requiring higher precision, a power saw with a water-cooled diamond blade is used.
Cut bricks are categorized by size. Bricks cut to half their original length are called half-bats, while those cut to three-fourths their length are known as three-fourth bats.
Special types of...
1.1K
Design Example: Designing Water Slide01:18

Design Example: Designing Water Slide

When designing a water slide, controlling the speed of water flow is crucial for rider safety while maintaining an exciting experience. As water flows down the slide, gravity causes it to accelerate, with its speed at the bottom depending on the height from which it starts. The higher the slide, the more potential energy the water has at the top, which is converted into kinetic energy as it descends, increasing its speed.
Bernoulli's principle determines the water's velocity along the slide....
794
Trial and Error and Algorithm01:12

Trial and Error and Algorithm

A problem-solving strategy is a plan of action used to find a solution. Different strategies have distinct action plans. Trial and error involves trying different solutions until one works. For instance, to fix a broken printer, you might check ink levels, ensure the paper tray isn't jammed, and verify the printer's connection to your laptop. This method can be time-consuming but is commonly used. Thomas Edison, for example, used trial and error to find a suitable filament for the light...
545