Related Experiment Video
Updated: Jul 1, 2025

Kinematic History of a Salient-recess Junction Explored through a Combined Approach of Field Data and Analog Sandbox Modeling
Published on: August 5, 2016
Parameters and surrounding rock control of gob-side driving under double key stratum after roof cutting
Lei Xu1,2, Yuzhao Ma3, Davide Elmo4
1School of Civil Engineering, Henan Polytechnic University, Jiaozuo, 454000, Henan, China. hpuxulei@hpu.edu.cn.
Abstract:
Taking the return-airway 4204 with roof cutting in Longquan Coal Mine as the engineering background, roof structure, key parameters, and deviatoric stress evolution were studied. Conclusion: The Key Stratum within a 4-8 times mining height is considered as Near Key Stratum. Cutting the roof makes it possible to form a cantilever structure of the Key Stratum on the solid coal side, which is more conducive to the stability of gob-side roadway. During cutting angle of 90-55°, the deviatoric stress increases linearly, and the increase rate is coal pillar > solid coal > roof > floor. While cutting length from 0 to 35 m, the deviatoric stress decreases linearly, and the decreasing range: coal pillar > solid coal > roof > floor. When coal pillar width is from 30 to 4 m, the deviatoric stress of left side and floor presents a "single peak" distribution. The deviatoric stress of coal pillar changes from an asymmetric "double peak" to a bell-shaped distribution, and the deviatoric stress of roof changes from a "single peak" to an asymmetric "double peak" distribution. Under same coal pillar width, the deviatoric stress of left, coal pillar and roof after roof cutting decreases most obviously, followed by the floor. Finally, the coal pillar width is 8 m, the cutting angle is 75°, the cutting length is 20 m, and the hole spacing is 1.0 m. The support scheme is bolt + metal mesh + steel belt + anchor cable combined support. The stable period of roadway is about 10 days.
More Related Videos
Related Concept Videos
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...
Taping Over Different Ground Profiles
Design Example: Maintaining Level of an Embankment
Wedges
Consider using a wedge to lift a heavy slab. Here, the wedge functions by converting the applied force into a much larger force directed almost perpendicular to the initial force. This...
Stone Masonry

