Related Experiment Video
Updated: Jul 1, 2025

Applicability Analysis of Assessment Methods for Morphological Parameters of Corroded Steel Bars
Published on: November 1, 2018
Multi-defect risk assessment in high-speed rail subgrade infrastructure in China
Jinchen Wang1,2, Yinsheng Zhang3, Luqi Wang2
1Key Laboratory of Geological Hazards On Three Gorges Reservoir Area of Ministry of Education, China Three Gorges University, Yichang, 443002, Hubei, People's Republic of China.
Abstract:
This study addresses the escalating risk of high-speed railway (HSR) infrastructure in China, amplified by climate warming, increased rainfall, frequent extreme weather, and geohazard events. Leveraging a georeferenced dataset of recent HSR defects obtained through an extensive literature review, we employ machine learning techniques for a quantitative multi-defect risk assessment. Climatic, geomorphological, geohydrological, and anthropogenic variables influencing HSR subgrade safety are identified and ranked. Climatic factors significantly impact frost damage and mud pumping, while geomorphological variables exhibit greater influence on settlement and uplift deformation defects. Notably, frost damage is prevalent in the northeast and northwest, mud pumping along the southeast coast, and settlement and uplift deformation in the northwest and central areas. The generated comprehensive risk map underscores high-risk zones, particularly the Menyuan Hui Autonomous and Minle County sections of the Lanzhou-Urumqi HSR, emphasizing the need for focused attention and preventive actions to mitigate potential losses and ensure operational continuity.
Related Concept Videos
Design Consideration
The factor of safety is another key...
Deleterious Substances in Aggregate
Another type of impurity is clay and fine material that...
Maximum Deflection
The maximum deflection occurs at a specific point, known as point O, where the tangent to the deflection curve is horizontal. To find point O, the slope of the tangent at any...
Microcracking in Concrete
Design Example: Managing Concrete Workability
Fatigue

