Related Experiment Video
Updated: Jul 1, 2025

In Situ Soil Moisture Sensors in Undisturbed Soils
Published on: November 18, 2022
Site selection optimization for 100% renewable energy sources
1Department of Industrial Engineering, Faculty of Engineering, Tarsus University, Tarsus, 33400, Mersin, Turkey. onurderse@tarsus.edu.tr.
Abstract:
The increase in the use of Renewable Energy Sources (RES) provides many advantages such as reducing the environmental problems and sustainability. In this study, a long-term optimum RES settlement strategic plan is conducted for 81 provinces in Turkey by considering real data. Biomass energy, solar energy, hydroelectric energy, geothermal energy, and wind energy are considered RES sources. Energy consumption until the 2050 year is estimated with the regARIMA method, and then a weighted goal programming model was developed in which the outputs of the regARIMA method and risk analysis are integrated. The results of the regARIMA method are tested, and the test results indicate that an R2 value close to 1 indicates that the model is suitable, a low and negative MPE value is neutral, and a MAPE value below 4% indicates high accuracy of the model. Using GAMS 23.5 optimization software program, the developed weighted goal programming model is solved optimally. In this integrated model developed, the objectives of minimizing the installation time, minimizing the investment cost, minimizing the annual cost, maximizing the carbon emission reduction, maximizing the usage time, and minimizing the risk are considered. When the results obtained regarding the number of installations according to the model are examined, the decisions are made for 53% wind energy, 23% biomass energy, 13% hydroelectric energy, 9% solar energy, and 2% geothermal energy. Computational results show that the effective solutions are obtained by minimizing the sum of goals values, covering all provinces in Turkey, and considering real data.
Related Concept Videos
Sustainable Development
Wind Turbine Machine Models
Induction machines interact through the rotating magnetic field generated by the stator and the rotor. The key parameter is slip, which is the difference between synchronous speed and rotor speed relative to synchronous speed. Slip is...
Design Example: Alignment of a Road Line Using GIS
Transmission Line Design Considerations
Fast Decoupled and DC Powerflow
Generator Voltage Control

