Excavation method optimization and mechanical responses investigating of a shallow buried super large section
Yunteng Chen1, Xiaoliang Geng2, Jianjun Li2
1Shaoxing Communications Investment Group Co., Ltd., Shaoxing, 312000, China.
Abstract:
The construction of super large section (SLS) shallow buried tunnels involves challenges related to their large span, high flat rate, and complex construction process. Selecting an appropriate excavation method is crucial for ensuring stability, controlling costs, and managing the construction timeline. This study focuses on the selection of excavation methods and the mechanical responses of SLS tunnels in different types of surrounding rock. The research is based on the Yangjiashan tunnel project in Zhejiang Province, China, which is a four-line highway tunnel with a span of 21.3 m. Three sequential excavation methods were proposed and simulated using the three-dimensional finite difference method: the "upper first and lower later" side drift (SD) method, the central diaphragm method, and the top heading and bench (HB) method. The mechanical response characteristics of tunnel construction under these methods were investigated, including rock deformation, rock pressure, and the internal forces acting on the primary support. By comparing the performance of the three construction methods in rock masses of Grades III to V, the study aimed to determine the optimal construction method for SLS tunnels considering factors such as safety, cost, and schedule. Field tests were conducted to evaluate the effectiveness of the optimized construction scheme. The results of the field monitoring indicated that the "upper first and lower later" SD method in Grade V rock mass and the HB method in Grade III to IV rock mass are feasible and cost-effective under certain conditions. The research findings provide valuable insights for the design and construction of SLS tunnels in complex conditions, serving as a reference for engineers and project managers.
Related Concept Videos
Design Example: Maintaining Level of an Embankment
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...