Ditch control and land reclamation promote vegetation recovery in Loess Plateau

Hui Kong1,2,3, Liangyan Yang2,3, Dan Wu1,3

  • 1Institute of Land Engineering and Technology, Shaanxi Land Engineering Construction Group Co., Ltd., Xi'an 710075, China.

Related Concept Videos

Ecological Succession02:17

Ecological Succession

Ecological succession is influenced by the processes of facilitation, inhibition, and toleration. Facilitation occurs when early successional species create more favorable ecological conditions for subsequent species, such as enhanced nutrient, water, or light availability. In contrast, inhibition happens when early successional species create unfavorable ecological conditions for potential successive species, such as limiting resource availability. In some cases, later successional species...
17.2K
Responses to Drought and Flooding02:41

Responses to Drought and Flooding

Water plays a significant role in the life cycle of plants. However, insufficient or excess of water can be detrimental and pose a serious threat to plants.
10.7K
Adaptations that Reduce Water Loss01:57

Adaptations that Reduce Water Loss

Though evaporation from plant leaves drives transpiration, it also results in loss of water. Because water is critical for photosynthetic reactions and other cellular processes, evolutionary pressures on plants in different environments have driven the acquisition of adaptations that reduce water loss.
25.6K
Bioremediation00:46

Bioremediation

Bioremediation is the use of prokaryotes, fungi, or plants to remove pollutants from the environment. This process has been used to remove harmful toxins in groundwater as a byproduct of agricultural run-off and also to clean up oil spills.
18.3K
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61