Calculation of additional load and deformation of the receiving well enclosure structure caused by shield tunneling
Li Xin1,2, Li-Guang Chen1,2, Tong Li1,2
1China Construction Municipal Engineering Corporation Limited, Beijing, China.
Abstract:
The bulkhead additional thrust during shield tunneling, the force of friction between shield and soil, and the additional grouting pressure can cause additional stress in the surrounding soil, thereby disturbing existing buildings and structures. However, few studies focused on the disturbance situation when the shield tunneling machine approaches the receiving well. If the additional stress and deformation of the receiving well are too excessive, it could result in the collapse of the receiving well. Based on the two-stage method, this study derived the calculation formula of the additional stress and deformation of the receiving well enclosure structure caused by shield tunneling. Taking a shield machine receiving engineering as the context, this study established a numerical simulation model and compared theoretical calculation, the results of numerical simulation model and on-site monitoring data. Finally, the additional stress of the receiving well is analyzed. The research findings demonstrate that the theoretical prediction results, numerical simulation calculation results, and on-site monitoring data exhibit relatively small calculation errors, which validated the applicability of the theoretical prediction formula and numerical simulation model. As the distance between the shield machine and the receiving well decreases, the disturbance to the receiving well increases sharply. When the distance between the cutter head and the receiving well is less than three times the shield length, it is crucial to enhance the deformation monitoring of the receiving well. The primary factors affecting the additional load and deformation of the receiving well enclosure structure are the force of friction between shield and soil and the additional thrust of the cutterhead. The disturbance caused by the additional grouting pressure on the enclosure structure can be ignored.
Related Concept Videos
Internal Loadings in Structural Members: Problem Solving
To illustrate this, let's consider a beam OC of 5 kN, inclined at an angle of 53.13° with the horizontal and supported at both ends. Determine the internal...
Castigliano's Theorem: Problem Solving
Thin-Walled Hollow Shafts
Statically Indeterminate Problem Solving
Deformation of Member under Multiple Loadings
In the case of a member with a variable cross-section, the strain is not constant but depends on the position. The deformation of an...
Eccentric Loading