Modelling Asphalt Overlay As-Built Roughness Based on Profile Transformation-Case for Paver Using Automatic Levelling

Rodrigo Díaz-Torrealba1, José Ramón Marcobal1, Juan Gallego1

  • 1Departamento de Ingeniería del Transporte, Territorio y Urbanismo, Universidad Politécnica de Madrid, 28040 Madrid, Spain.

PubMed
Summary

Predicting pavement smoothness is crucial for road engineering. This study enhances a model for predicting as-built International Roughness Index (IRI) in asphalt overlays, incorporating automatic screed control for improved accuracy.

Related Concept Videos

Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61
Differential Leveling01:12

Differential Leveling

Differential leveling is a precise method in surveying used to determine the elevation difference between two points. Its primary goal is to establish accurate vertical measurements to create level surfaces or grade lines critical for designing and constructing infrastructures such as roads, bridges, and buildings.The procedure for differential leveling begins with setting up and leveling the instrument at a point where the benchmark can be seen. The level rod is held on the benchmark (BM), and...
175
Profile Leveling and Cross Sections01:26

Profile Leveling and Cross Sections

Profile leveling and cross-sections are surveying methods used to determine and document terrain elevations for infrastructure projects such as highways, railroads, canals, and pipelines. These methods provide data for earthwork planning and alignment of proposed routes.  Profile leveling involves measuring elevations along a fixed line to create a vertical terrain profile. A surveyor sets up a leveling instrument at the benchmark (BM) and records a backsight (BS) to determine the...
210
Influence of Earth's Curvature and Atmospheric Refraction on Leveling01:26

Influence of Earth's Curvature and Atmospheric Refraction on Leveling

During leveling, the Earth's curvature and atmospheric refraction introduce deviations in the line of sight from a true horizontal reference. When the line of sight is leveled, it remains perpendicular to the plumb line only at a single point. Beyond this, it deviates due to the Earth’s curvature, represented by the correction C. For a sight distance D, the deviation can be derived using the relationship:This relationship shows that the deviation increases quadratically with distance.
92
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
25
Common Leveling Mistakes and Errors01:17

Common Leveling Mistakes and Errors

A survey team is tasked with determining the elevation difference between points Point A and Point B, separated by uneven terrain. They use a leveling instrument and a leveling rod.Common MistakesMisreading the Rod: During a backsight reading at Point A, the instrumentman observes the rod partially obscured by tall grass. Instead of reading 1.135 m, they mistakenly record 1.735 m due to the misalignment of the crosshair with the wrong graduation. This error adds 0.600 m to all subsequent...
72