The factors affecting the performance of the tunnel wall drilling task and their priority

Peng-Fei Gao1,2, Jin-Yi Zhi3,4, Ji-Dong Hu5

  • 1Department of Industrial Design, School of Design, Southwest Jiaotong University, Chengdu, 610031, China. Gaopengfei@swjtu.edu.cn.

Scientific Reports
|April 26, 2024
PubMed

Related Concept Videos

Factors Affecting Workability01:24

Factors Affecting Workability

The workability of concrete is a critical characteristic that influences the ease of mixing, handling, and finishing the concrete. It is affected by several factors including water content, aggregate properties, and admixtures like air entrainment. Water plays a fundamental role as it lubricates the concrete mix, facilitating easier movement and placement. However, the water requirement varies depending on the texture and shape of aggregates. Finer particles and angular, rough-textured...
72
Posttensioned Masonry Walls01:15

Posttensioned Masonry Walls


Post-tensioned masonry walls use high-strength steel rods or flexible tendons to enhance the strength and efficiency of masonry structures. These elements are securely anchored to the foundation and extend vertically either within the cores of the masonry units or between the masonry wythes. The construction process involves building the wall with these tensioning elements in place and allowing the mortar to fully cure.
Following the curing process, the tensioning begins. Steel rods are...
145
Taping Over Different Ground Profiles01:12

Taping Over Different Ground Profiles

Taping over varying ground profiles requires careful adaptation to achieve accurate measurements. On smooth, level ground with minimal vegetation, the tape can rest directly on the ground. Here, the taping team, typically consisting of a head and a rear tapeman, coordinates their positions with clear communication. The rear tapeman holds the tape at the starting point and guides the head tapeman toward a range pole placed beyond the endpoint, using hand or voice signals to ensure alignment.On...
25
Design Consideration01:22

Design Consideration

Designing a structure involves a series of considerations, primarily the material's ultimate strength, calculated through tests that measure changes under increased force until the material reaches its breaking point or limit. The ultimate load, where the material breaks, is divided by its original cross-sectional area, resulting in the ultimate normal stress or strength. The ultimate shearing stress is another significant factor taken into account.
The factor of safety is another key...
186
Laying Concrete Masonry01:16

Laying Concrete Masonry

Constructing a concrete masonry wall involves a series of steps designed to ensure durability, stability, and alignment. The construction starts with preparing the base, which includes cleaning the area where the wall will be erected. The next step involves spreading mortar where the first row of concrete blocks will be laid, typically starting at a corner section to help define the wall's boundaries.
Mortar application focuses on the face shells of the blocks, the sides that face outward,...
94
Masonry Cavity Walls01:26

Masonry Cavity Walls

Cavity walls feature a hollow space between the outer and inner wythes, connected only by corrosion-resistant metal ties. When water seeps through the outer wythe, it descends within this cavity, intercepted by flashing and eventually exiting through weep holes. To enhance moisture resistance, the inner wythe's cavity side often receives damp-proofing, doubling as an air barrier. The cavity can also house insulation to mitigate heat transfer.
Maintaining a clean cavity during construction...
1.0K