Related Experiment Video
Updated: Jun 27, 2025

Study of Siphon Breaker Experiment and Simulation for a Research Reactor
Published on: September 26, 2017
Analysis of Uncertainty and Sensitivity in Tailings Dam Breach-Runout Numerical Modelling
Negar Ghahramani1,2, Daniel A M Adria1,3, Nahyan M Rana4
1Department of Earth, Ocean and Atmospheric Sciences, The University of British Columbia, Vancouver, Canada.
Abstract:
Tailings dam breaches (TDBs) and subsequent flows can pose significant risk to public safety, the environment, and the economy. Numerical runout models are used to simulate potential tailings flows and understand their downstream impacts. Due to the complex nature of the breach-runout processes, the mobility and downstream impacts of these types of failures are highly uncertain. We applied the first-order second-moment (FOSM) methodology to a database of 11 back-analyzed historical tailings flows to evaluate uncertainties in TDB runout modelling and conducted a sensitivity analysis to identify key factors contributing to the variability of the HEC-RAS model output, including at different locations along the runout path. The results indicate that prioritizing resources toward advancements in estimating the values of primary contributors to the sensitivity of the selected model outputs is necessary for more reliable model results. We found that the total released volume is among the top contributors to the sensitivity of modelled inundation area and maximum flow depth, while surface roughness is among the top contributors to the sensitivity of modelled maximum flow velocity and flow front arrival time. However, the primary contributors to the sensitivity of the model outputs varied depending on the case study; therefore, the selection of appropriate rheological models and consideration of site-specific conditions are crucial for accurate predictions. The study proposes and demonstrates the FOSM methodology as an approximate probabilistic approach to model-based tailings flow runout prediction, which can help improve the accuracy of risk assessments and emergency response plans.
Supplementary Information:
The online version contains supplementary material available at 10.1007/s10230-024-00970-w.
Related Concept Videos
Design Example: Creating a Hydraulic Model of a Dam Spillway
Typical Model Studies
Design Example: Analyzing Capacity Contours for Flood Risk Assessment
Modeling and Similitude
Propagation of Uncertainty from Random Error
Assumptions of Survival Analysis

