Related Experiment Video
Updated: Jun 27, 2025

Integrated Field Lysimetry and Porewater Sampling for Evaluation of Chemical Mobility in Soils and Established Vegetation
Published on: July 4, 2014
Asbestos exposures associated with the use and handling of drilling mud additives
Evan Anderson1, Michael Holton1, Jennifer Ellis1
1Ramboll, Princeton, NJ, USA.
Abstract:
This paper summarizes historical asbestos exposure data collected during the handling of short-fiber chrysotile asbestos that was used as an additive to drilling fluid in oil and gas exploration. A total of 1171 industrial hygiene (IH) personal and area air samples were collected and analyzed from more than 20 drilling rigs between 1972 and 1985. The dataset consists of 1097 short-term samples (<240 min) with more than 80% having sample durations less than 30 min. Average airborne fiber concentrations measured during asbestos handling activities ranged from 0.62 f/cc to 3.39 f/cc using phase-contrast microscopy (PCM). An additional 14 samples were considered long-term samples (>240 min) and there were 60 samples with no reported sample duration. Eight-hour time-weighted average (8-h TWA) results, calculated using short-term samples, along with long-term samples greater than 240 min, did not exceed contemporaneous Occupational Safety and Health Administration (OSHA) permissible exposure limits (PELs). This analysis fills a data gap in the evaluation of asbestos exposures from the use of drilling mud additives (DMAs) that contained chrysotile asbestos.
More Related Videos
Related Concept Videos
Additives and Fillers in Concrete
The...
Deleterious Substances in Aggregate
Another type of impurity is clay and fine material that...
Masonry in Cold and Hot Weather Conditions
Other key practices include keeping masonry units...
Plasticizers
Plasticizers function by using surface-active agents to create repulsive electrostatic forces between cement particles. This dispersion enhances the concrete's...
Superplasticizers
Quarrying of Stone
One common method involves using a diamond belt saw to cut large blocks from the quarry face. These blocks can be about 50 feet long and 12 feet high. After the initial vertical cut, drilling is performed at the base of the...

