River valley urban network and morphology: A study on the urban morphology evolution of Lanzhou

Minan Yang1,2, Yongsheng Qian1, Xin Li1

  • 1School of Traffic and Transportation, Lanzhou Jiaotong University, Lanzhou, China.

Plos One
|May 28, 2024
PubMed

Related Concept Videos

Design Example: Analyzing Capacity Contours for Flood Risk Assessment01:17

Design Example: Analyzing Capacity Contours for Flood Risk Assessment

Flood risk assessment involves careful planning and analysis to ensure the safety of communities near water retention structures. Capacity contours are a vital tool in this process, as they illustrate the potential spread of water at specific levels in a given area. In the context of building a bund across a small valley, these contours play a critical role in evaluating the safety of nearby residential areas.In this example, the bund is intended to store stormwater in the valley. The engineers...
43
Design Example: Design of an Irrigation Channel01:27

Design Example: Design of an Irrigation Channel

Trapezoidal channels are widely used in irrigation systems due to their cost-effectiveness and efficiency in conveying water. Trapezoidal channels feature a flat bottom and sloping sides, making them stable and easier to construct compared to other shapes. The bottom width and side slope ratio are determined based on the required flow capacity and site conditions. The side slope is kept gentle for unlined channels to prevent soil erosion.Hydraulic parameters in channel design include the flow...
91
Design Example: Maintaining Level of an Embankment01:19

Design Example: Maintaining Level of an Embankment

Constructing a roadway embankment over uneven terrain requires precise leveling to ensure stability and proper drainage. Surveyors use a leveling instrument and staff to calculate ground elevations and determine the required fill material at each point along the embankment alignment.The process begins by positioning a leveling instrument near a benchmark with a known elevation. A backsight reading establishes the instrument height, which serves as a reference for subsequent measurements. A...
61
Design Example: Alignment of a Road Line Using GIS01:17

Design Example: Alignment of a Road Line Using GIS

The alignment of a road line using Geographic Information Systems (GIS) is a critical process in civil engineering, combining advanced technology with practical decision-making. This methodology begins with the collection of geospatial data, including information on land cover, geomorphology, drainage patterns, slope, and contour details. Such data is typically acquired through satellite imagery and GIS tools, offering a comprehensive understanding of the terrain.Once the data is gathered, it...
47
Pozzolans01:21

Pozzolans

Pozzolans are siliceous or aluminous materials blended with Portland cement. They interact with the calcium hydroxide produced during the hydration of Portland cement and contribute to improved strength and durability of concrete. The pozzolanic activity, a measure of a pozzolan's effectiveness, is typically assessed using the strength activity index, as defined in ASTM C 618-93, which calculates the ratio of the compressive strength of cement mixtures with and without pozzolan.
Fly ash is...
111
Thematic Layering in GIS01:30

Thematic Layering in GIS

In the past, planning projects such as schools or public facilities required extensive manual effort to gather and compile data. Information such as property boundaries, soil characteristics, road networks, zoning regulations, and flood zones had to be sourced individually from courthouses, utility providers, and registry offices. Assembling these datasets into a coherent format often took several months, delaying project timelines.The introduction of Geographic Information Systems (GIS)...
35